My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Economic Development Authority - 09/03/2015
Ramsey
>
Public
>
Agendas
>
Economic Development Authority
>
2015
>
Agenda - Economic Development Authority - 09/03/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 10:11:56 AM
Creation date
9/9/2015 9:28:20 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Economic Development Authority
Document Date
09/03/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST CONSIDERATIONS <br />Costs were developed based upon phased implementation. The phasing is as depicted on Figure 4 in <br />Appendix A. All costs presented in the following pages are 2015 costs, with no allowance for inflation. <br />Improvement Type Phase 1 Phase 2 Phase 3 <br />Roadway $ 1,427,000 $ 1,383,000 $ 1,626,000 <br />Trails/Sidewalks $ 220,000 $ 146,000 $ 175,000 <br />Storm Water Management $ 0 $ 0 $ 64,000 <br />Street Lighting $ 143,000 $ 104,000 $ 126,000 <br />Trunk Water $ 19,000 $ 219,000 $ 247,000 <br />Trunk Sanitary Sewer $ 11,000 $ 188,000 $ 654,000 <br />Total Costs/Phase $ 1,820,000 $ 2,040,000 $ 2,892,000 <br />The above costs are considered project costs and include 30% contingencies and project development <br />costs. Project development costs include administrative, engineering, and fiscal related costs. <br />The roadway costs include allotments for phase transitions associated with tapering pavements sections <br />to match in-place sections where required, and subsequent removals of the transition areas. Right turn <br />lanes are not depicted on the graphics, but will be required. The actual right turn lane locations and <br />lengths will be determined by the entrance locations, land use and associated traffic impacts. Costs are <br />included for right turn lanes in the roadway estimate. <br />Street lighting costs are based upon recent installations within the City of Ramsey. <br />For storm water management, costs were included for manholes, catch basins, and pipe within the <br />street sections and included in the roadway costs. No costs for ponding were included for Phases 1, and <br />2. For Phase 3, ponding costs were included for excavation related activities. We assumed a ponding <br />area would be acquired through the platting process, and ponding within a development site would be <br />expanded to include volume for roadway drainage. <br />The Phase 2 limits are based upon the area that can be served by a gravity sanitary sewer system. The <br />Phase 3 sanitary sewer costs include a lift station and forcemain. <br />COST ALLOCATION ALTERNATIVES <br />The costs, or a portion of the costs, of the improvements are typically allocated back to adjacent <br />properties through the use of assessments, fees and other methods. The costs are typically allocated in <br />a way that is equitable to the properties benefitting from the improvements. Public improvements that <br />will become City owned and maintained are typically constructed through a public process, while <br />secondary improvements are constructed by the property owner. For our analysis, we assumed the <br />following items would be constructed through the public process: <br />Prepared by: Bolton & Menk, Inc. COST CONSIDERATIONS <br />City of Ramsey — Future Business Park Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.