Laserfiche WebLink
Review File: Parkview East <br />Site Plan Review: Landscaping <br />March 27, 2015 <br />Page 2 of 3 <br />watering). Please revise Sheet C2.7 to specify that boulevards will be established with <br />topsoil and sod. <br />• Planting details must be added to Sheet C2.7 to include the following <br />o Planting depth shall be such that the 1st set of primary roots is at finished grade <br />o Only prune out dead/broken/deformed branches at time of installation <br />o Remove upper 1/3 of wire basket and burlap after being placed in planting hole <br />o 2-4 inches of wood chip mulch shall be included around all trees. Mulch shall not <br />be piled against the trunk of trees. <br />• The proposed street trees are too close together, the overall number should be reduced <br />so that the spacing is equal to 30-35 feet on center. Please revise Sheet C2.7 to reflect <br />the proper spacing and update the quantities for each species accordingly. <br />• All plantings shall be outside the vision clearance triangle at all intersections and access <br />points. Definition of the vision clearance triangle can be found in City Code Section 117- <br />348 (g). Please revise Sheet C2.7 to identify the vision clearance triangle at all <br />intersections and access points and ensure that no plantings are within this area. <br />• Street trees should be planted with one (1) species per block or, if a standard block does <br />not exist, such as along Ramsey Parkway and Rhinestone Street, in blocks or groups <br />consisting of 5-6 trees of the same species. Please revise Sheet C2.7 to reflect the street <br />trees planted in linear groups of 5-6 trees per one species. <br />• Street trees shall have a minimum branch height of not less than five (5) feet. Please <br />revise Sheet C2.7 to include this note. <br />• There are no foundation plantings or internal landscape elements shown on the plan. <br />Are any plantings proposed? How about within any of the parking lot islands? <br />• It appears that there will be a very narrow strip of vegetation between the sidewalk and <br />the retaining wall along Sapphire Street. It would be recommended to eliminate that <br />and just widen the sidewalk to abut the wall. <br />• The plan must be revised to identify turf establishment with sod. The notes refer to <br />both sod and seed but there is no legend or labels to determine which is being used and <br />where. Please note that any alternative to the sod requirement requires City Council <br />approval. <br />• Upon acceptance of landscaping by City, a two (2) year maintenance guarantee is <br />required to ensure survival of plantings. <br />• The project is subject to the City's topsoil requirement, which states that all disturbed <br />areas not otherwise improved with walkways, driveway, home and other impervious <br />surfacing, shall receive four (4) inches of topsoil meeting the City's topsoil <br />specification. A topsoil inspection is required prior to landscaping being installed and <br />copies of the load tickets are required as well. This is reviewed at time of Building <br />Permit Application and request for Certificate of Occupancy. Please update the Landscape <br />Installation Notes to include this requirement. <br />