Laserfiche WebLink
Review File: Parkview East <br />Site Plan Review: Landscaping <br />March 27, 2015 <br />Page 3 of 3 <br />• The plans do not indicate whether an irrigation system will be installed or not. Establishment <br />of the streetscape (trees and sod), including watering, is the responsibility of the Developer <br />(and eventually the property management company). In ground irrigation within the <br />boulevard area is subject to review and approval by the City. <br />Please submit a revised landscaping plan that addresses these matters. <br />Tree Preservation: This site is devoid of any significant tree cover and therefore, no tree <br />preservation plan is necessary. <br />Stormwater: It appears that the site will utilize a subsurface stormwater system to achieve the <br />required infiltration of the first one (1) inch of rainfall in accordance with the Lower Rum River Water <br />Management Organization's 3rd Generation Plan. The system appears to be designed with an overflow <br />outlet that allows runoff from larger events to outlet into the existing storm sewer infrastructure in <br />Sapphire St where it will eventually be routed to a regional pond. The Engineering Division will be <br />completing a more comprehensive review of the grading/drainage plans. <br />