My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/27/2004
Ramsey
>
Public
>
Agendas
>
Council
>
2004
>
Agenda - Council - 04/27/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 2:25:48 PM
Creation date
4/23/2004 2:44:16 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/27/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASE # <br /> <br />RECEIVE BIDS AND AWARD CONTRACT FOR IMPROVEMENT PROJECT #03-29, <br />MSA STREETS IN RAMSEY TOWN CENTER <br /> By: Brian E. Olson, Assistant Public Works Director <br /> <br />Background: <br /> <br />Improvement Project #03-29 consists of bituminous surfacing, drainage improvements, sanitary <br />sewer, watermain and miscellaneous improvements on Sunwood Drive from Ramsey Boulevard <br />to Armstrong Boulevard and Rhinestone Street from Sunwood Drive to Bunker Lake Boulevard. <br />Authorization to advertise for bids was ordered on March 9, 2004, and bids were opened on <br />Wednesday, April 21, 2004. <br /> <br />Nine (9) bids were received and ranged from $4,668,665.93 to $5,211,942.70. A summary of the <br />bidding is as follows: <br /> <br />Bidder <br />Glenn Rehbein Excavating <br />S.R. Weidema, Inc. <br />Arcon Construction, Inc. <br />Nodland Construction Co <br />Three Rivers Construction <br />S.J. Louis construction, Inc. <br />LaTour Construction <br />Northdale Construction <br />Barbarossa & Sons, Inc. <br /> <br />Amount of Bid <br />$4,668,665.93 <br />$4,822,292.44 <br />$4,959,861.13 <br />$4,962,636.80 <br />$4,970,966.70 <br />$4,987,632.30 <br />$5,116,232.89 <br />$5,127,009.60 <br />$5,211,942.70 <br /> <br />Engineers Estimate: <br /> <br />$4,996,919.50 <br /> <br />As part of the Master Development Agreement for the Ramsey Town Center, this is a major <br />portion of the City Phase I Construction that will be partially assessed to the RTC. Since it is an <br />assessment project, a petition from the property owners that will be assessed for this <br />improvement will be necessary as well as a Feasibility Study needs to be prepared. The petition <br />and feasibility study are attached. <br /> <br />Also pursuant to Section 7.2 of the Master Development Agreement, the city is not obligated to <br />issue the bonds or commence construction of the City Phase I Roadway Improvements until: <br /> <br />a) <br /> <br />The Developer has substantially completed the mass grading described in Section I0. ~ <br />pursuant to the Master Grading Plan; <br /> <br />b) <br /> <br />the Developer has provided the City with and the City has approved a detailed <br />landscaping plan specifically describing the landscaping which' the Developer will <br />construct and install within or adjacent to the rights-of-way for the City Phase I Roadway <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.