My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/27/2004
Ramsey
>
Public
>
Agendas
>
Council
>
2004
>
Agenda - Council - 04/27/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 2:25:48 PM
Creation date
4/23/2004 2:44:16 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/27/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.0 ESTIMATED COSTS <br /> <br />The estimated project' costs presented herein reflect the construction and <br />overhead costs. Construction costs are estimated contract amounts for the <br />actual construction. <br /> <br />Overhead costs include, but are not limited to, engineering, construction staking <br />and inspection, administrative service, legal, and contingency. Overhead costs <br />for the project are estimated based on percentages of construction cost. Those <br />percentages are estimated to be as follows: <br /> <br />· Engineering 7% <br />· Staking & Inspection 6% ~ <br /> <br />· Bonding, Legal, and City Staff Administration 3% <br />· Contingencies 4% <br /> <br />The summary of estimated cost of construction and overhead are shown below <br />in Table 1. <br /> <br />TABLE I <br /> <br />SUMMARY OF ESTIMATED TOTAL PROJECT COST <br /> <br />· Signal Construction Cost $ 500,100 <br />· Bridge Construction Cost $ 540,000 <br />· Street Construction Cost $2,474,800 <br />· Storm Drainage Construction Cost $ 829,264 <br />· Water Construction Cost $ 643,010 <br />· Sanitary Sewer Construction Cost $1,049,836 <br />· Total Estimated Construction Cost $6,037,010 <br /> <br /> $1,2O7,4O2 <br /> $7,244,412 <br /> <br />· Construction Overhead Cost (20%) <br /> Total Project Cost <br /> <br />In projecting the estimated costs of construction, data from projects constructed <br />in the metropolitan area over the last several years and a working knowledge of <br />the construction activity in the area were used. These costs are expressed in <br />current dollars. <br /> <br />6.0 METHOD OF PAYMENT <br /> <br />In accordance to the Master Development Agreement for the Ramsey Town <br />Center, the proposed street improvements are to be assessed in accordance <br />with Minnesota Statutes 429. Under this method, the cost of the project would <br />be assessed annually against the property as shown on Exhibit "F" for a period of <br /> <br />Page 5 <br />G:\Municipal~,ramsey\3171\RA3171 FSR.doc <br /> <br /> <br />