Laserfiche WebLink
Project Manave n er7t <br />City of Ramsey <br />2016 Mississippi River Trail <br />Split Project Budget Analysis <br />Pub lc a A .E-riC'i; L ril ii r+lI,--atiOfl <br />proms M*rnr ndiam (COrropietteCI with Phira#F1} <br />, rttt hiiic l Engineering <br />Utility Coordination <br />Data Collection (Prelim' nary SurnxeV) <br />pre imi^ary Diesiv L.ayout <br />Mr- <br />1-a Des g ^ and Plan and specification FPFepar'aticn <br />fade••al A d Ap rival 111•31: are eats and Losa 1st rir ates <br />Pet YY is <br />llian Reviews and updates <br />otals Through Federal Authorization <br />Bidding,-FealeraII Approval of Bidder <br />or str ct on Stair, Admin, Observation <br />loseout, Federal Audit <br />'Total Engineering <br />$3,063 <br />S13230 <br />so <br />c' <br />'.F <br />I 1 <br />$16,153 i <br />5915 i <br />248 <br />s.)'u <br />$3$,92I <br />$5,600 <br />21,.549 <br />S 1is,600 <br />1 <br />1 <br />I <br />1 <br />SSU.676 <br />ISu ni laall' <br />Cc TrOete <br />101140015 <br />59,652 <br />$10,527 <br />50 <br />$1,310 <br />$6,890 <br />58,800 <br />59,690 <br />55,527 <br />$3,145 <br />$8,552 <br />5930 <br />L <br />$115,3 <br />$5,600 <br />$14,600 <br />5253,694 <br />