My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Public Works Committee - 10/20/2015
Ramsey
>
Public
>
Minutes
>
Public Works Committee
>
2010 - 2019
>
2015
>
Minutes - Public Works Committee - 10/20/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:28:25 PM
Creation date
11/23/2015 10:27:17 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Public Works Committee
Document Date
10/20/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Community Development Director Gladhill commented a lot of this planning is dependent on the <br /> relationship with the City of Anoka. He said it is best to develop the site without any dependency <br /> with the City of Anoka just to be sure a situation doesn't arise in the future that could be <br /> undesirable. Another large consideration is the use of commercial asphalt. The City would need <br /> to acquire a right of way for this. He said there are a number of other factors as well. <br /> Economic Development Manager/Assistant City Administrator Brama stated this is an entire <br /> City-scope decision. The decisions made are based on facts that can be referred back to in the <br /> future if needed. The design is based on the ability to be built out. He noted there would be two <br /> outbuildings. One would be used for cold storage and one would be the Police Department <br /> impound garage. He explained the dotted lines on the maps in the meeting packet show potential <br /> build out areas in the future. Currently, that is not expected to be needed. <br /> Councilmember Shryock inquired whether all Public Works staff will be moved to the new <br /> location. <br /> Public Works Superintendent Riemer responded not all the staff will be moved. Engineering <br /> will stay where it is. At some point, a receptionist position may be added, but that is the only <br /> new position he would anticipate. <br /> Chairperson Riley asked about the storm ponds that separate the buildings in Option A. <br /> Public Works Superintendent Riemer stated that would be the green area. He said he didn't think <br /> the pond areas have been calculated yet. <br /> Councilmember Johns asked what a covered drying bed is. <br /> Public Works Superintendent Riemer explained it refers to caring for the material collected from <br /> jetting sanitary sewers. <br /> Councilmember Johns questioned the acreage of the existing buildings by Highway 10. <br /> Public Works Superintendent Riemer replied he believes it is 100 ft by 110 ft. <br /> Economic Development Manager/Assistant City Administrator Brama stated the difference <br /> between Options A and B is that Option B is it is just under 12 acres. Some area for operations <br /> will be lost. There would still be access from the north. He noted there are 21 acres of <br /> developable land. <br /> Public Works Superintendent Riemer stated the preferred option is Option A because the City <br /> could retain the existing buildings for future use and the PW campus would be contained on one <br /> continuous site. If McKinley Street is going to go through, it will split the site on Option B and <br /> that is not desirable. Employees will have to cross that road continually, and that is not efficient. <br /> Public Works Committee/ October 20, 2015 <br /> Page 7 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.