Laserfiche WebLink
present ,the look of typical strip suburban development. Bztildings shall be designed with a <br />pedestrian orientation and relationship to the primary street that is compatible with the adjacent <br />TC-1 Sub-District. <br /> <br />The uses shown in the submitted revision include a grocery store, several restaurants, and a bank <br />as well as other retail operations. <br /> <br />Staff received the latest revisions on April 27, 2004 and is not able to fully comment on the <br />sketch plan at the time of this Staff report. Some initial Comments Staff has are as follows: <br /> <br />· GeneralLayout. The revised plan presented to the City is more consistent with the original <br /> sketch plan approved in 2003 than the previous sketch plan. The area east of the intersection <br /> of Zeolite St. and Sunwood Drive, as in the previous sketch plan, is consistent with the <br /> approved sketch plan with retail and pedestrian opporttmities close to the street with parking in <br /> the rear. The previous sketch plan showed several buildings west of the Zeolite/Sunwood <br /> intersection starts setback from the street. The revised sketch plan brings several buildings <br /> closer to Sunwood Dr. in conformance with the approved sketch plan. As in the previous <br /> sketch plan, the Cobums Grocery Store is setback a distance from Sunwood Drive. There are <br /> still several buildings setback farther from Sunwood Drive than was shown in the approved <br /> sketch plan. (The 8K, 15K, and 30K bUildings). The orientation of the 13K and the 11K <br /> buildings towards Sunwood Dr. is a positive improvement. Staff finds that the building <br /> locations shown on the revised sketch plan is a reasonable solution to the desire of maintaining <br /> the vision of the original sketch plan and commercial site location realities. <br /> <br />· Coburns Grocery Store. The proposed Coburn grocery store plans on containing a pharmacy <br /> with a drive thru and a liquor store operation in a separate building. Coburns also would like <br /> have a gas station and a car washeast of their building. Under the Town Center Zoning <br /> District, uses with drive thrus and car washes require a conditional use permit. As the <br /> development proceeds to the site plan review, a Conditional Use Permit will need to be granted <br /> to allow for the drive-thru pharmacy and car wash. Under the Town Center Zoning District, <br /> gas stations are prohibited.. This prohibition was put primarily in place to not allow a flee <br /> standing gas station to be located in the Town Center. The gas station shown would be <br /> connected to the grocery store operation. Staffhas con~cerns with locating a gas station in the <br /> Town Center and would like to discuss this matter further with the Planning Commission. The <br /> applicant is aware of Staff' s concerns and will be ready to discuss the proposed gas station. <br /> Staff is requiring that the Coburns building have "four-sided" architecture meaning that all <br /> sides of the building will be required to have detailed architectural features and use high-quality <br /> materials. The Applicant has provided the City with architectural elevations showing some of <br /> this information. As part of the site plan review~ Staff will require more detailed information. <br /> <br />· Stormwater Ponding. The stormwater pond shown on the revised sketch plan increases the <br /> area of ponding fi:om the previoUs sketch plan and has made it more of an amenity as directed <br /> by staff. It should be noted that the City's Engineering Department still needs to review the <br /> capacity of the ponding to ensure that it will properly function <br /> <br />1t4 <br /> <br /> <br />