My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 05/06/2004
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2004
>
Agenda - Planning Commission - 05/06/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:33:24 AM
Creation date
5/4/2004 10:06:50 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
05/06/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Activities on and near the site and provisions for these activities: <br />AMCON Construction activities. The entire east parking area and access to this area will be <br />reserved for AaMCON construction traffic and staging. Signs will be posted to warn non- <br />construction drivers not to enter this area, If necessary, a barrier will be set up to keep non- <br />construction people and vehicles out of this area. Access to this parking area is needed from both <br />Peridot and E. Ramgey Parkway to ensure effective large truck access and drive through. <br /> <br />Street andTown Center Construction. As mentioned, Ramsey Town Center Construction activity <br />will travel into the area on Sunwood Drive and E. Ramsey Parkway. Pedestrian traffic on these <br />streets will be a concern to the school and we assume to the City as well. <br /> <br />Transition from Temporary Classrooms to Complete, Occupancy <br />Reserving the west parking lot tbr portable classrooms will delay completion of the parking lot <br />and landscaping in that area. As soon as the school occupies the rest of the building and the <br />portable classrooms are removed, construction activities will resume as quickly as possible. <br />Completing the construction of the parking lot will be an important pre-winter goal. Installing <br />concrete curbing and laying blacktop will be top pr/orities. Second priority is installing lights <br />around the parking lot. Finally, completing the landscaping will be attempted. Weather factors <br />may disrupt landscaping until Spring 2005. Until the west parking lot is completed, on-street <br />parking will remain an important need for the school to function. <br /> <br />As soon as temporary classroom walls are removed from the gymnasium, the gymnasium floor <br />will be completed. This will include final sanding and finishing. Due to fumes ti'om the finish this <br />work may delayed until a long weekend is available. Specific timing for this will be determined at <br />a later date. <br /> <br />20 <br /> <br />Page 4 of 6 <br /> <br /> PACT Charter School <br />~nte, rim [ ~e. Permit A nnlimqti~m A ktac. hment~ <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.