My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/11/2004
Ramsey
>
Public
>
Agendas
>
Council
>
2004
>
Agenda - Council - 05/11/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 2:26:14 PM
Creation date
5/10/2004 7:49:22 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/11/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Authorize Change Order to Install Sanitary <br />Sewer and Watermain on Basalt Street <br />South of 141st Avenue <br /> By Steve Jankowski, City Engineer <br /> <br />Background: <br /> <br />Ace Solid Waste is anticipating constructing a new building in the northwest coruer of <br />their McKinley Street site. Providing sewer and water to this location would be more <br />easily extended to this location from Basalt Street than from through their existing site. <br />Attached is a letter from Ace requesting the extension of utilities down Basalt Street to <br />facilitate this connection. Ace acknowledges in this letter that they are agreeable to <br />paying the appropriate hookup costs. <br /> <br />At the present time the City is completing a project which has provided sewer, <br />watermain, storm sewer and pavement on 141st Avenue and Basalt Street (north of 141st <br />Avenue). The work requested by Ace could be accomplished through a change order to <br />the scope of the work associated with that project. Attached to this case is a change order <br />extending the scope of Project 03-27, and a letter agreement with Ace Solid Waste which <br />identifies their share of the project cost. The agreement has been drafted such that Ace <br />will pay the amount that they would have paid if the utilities had been extended as service <br />to their site (six inch sewer and six inch water) which is estimated to be $15,533.25. The <br />City will pay the additional costs of upgrading the actual pipe sizes to meet minimum <br />sizes required for city mains (eight inch water and eight inch sewer). The city proposes <br />to finance the city share of this work, $8,746 from Tax Increment Financing (TIF) funds. <br /> <br />Recommendation: <br /> <br />Staff recommends that Council adopt the attached resolution authorizing Change Order <br />No 1 to Improvement Project 03-27 in the amount of $24,279.25 contingent upon Ace <br />Solid Waste entering into an agreement to pay their share of the project cost which is <br />estimated to be $15,533.25. <br /> <br />Action: <br /> <br />Motion to adopt Resolution 04-05-XX authorizing Change Order No 1 to Improvement <br />Project 03-27 in the amount of $24,279.25 contingent upon Ace Solid Waste entering <br />into an agreement to pay their share of the project cost which is estimated to be <br />$15,533.25. <br /> <br />Reviewed By: <br />Assistant Public Works Director <br />Finance Officer <br />TIF Specialist <br /> <br />CC: 05/11/04 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.