Laserfiche WebLink
Capital Improvement Program <br />City of Ramsey, Minnesota <br />2016 aim 2020 <br />Project # 15 -STM -004 <br />Project Name Alpine Drive Reconstruction <br />Type Improvement <br />Useful Life 50 Years <br />Category Storm Water Utility Improveme <br />Description <br />Department Stormwater Utility <br />Contact <br />Priority 6 -Planned <br />Status Active <br />Total Project Cost: $82,000 <br />Reconstruction of Alpine Drive from Armstrong <br />Total Project Cost = $793,600 <br />Street Improvement: $711,600 <br />Storm Water Improvement: $ 82,000 <br />Boulevard to Variolite Street <br />Justification <br />These streets are in poor condition and require reconstruction. The pavement has deteriorated beyond the point where an overlay could be <br />applied. This project will install concrete curb and gutter and storm sewer. <br />Expenditures <br />2016 2017 <br />2018 <br />2019 <br />2020 <br />Total <br />Improvements Other than <br />Building Cost <br />82,000 <br />82,000 <br />Total <br />Funding Sources <br />82,000 <br />82,000 <br />2016 2017 <br />2018 <br />2019 <br />2020 <br />Total <br />Storm Water Utility Fund 82,000 82,000 <br />Total <br />82,000 82,000 <br />137 <br />