Laserfiche WebLink
Capital Improvement Program <br />City of Ramsey, Minnesota <br />2016 aim 2020 <br />Project # 15 -STM -005 <br />Project Name Reconstruction Streets -Stanhope Terr <br />& North Forty <br />Type Improvement <br />Useful Life 50 Years <br />Category Storm Water Utility Improveme <br />Description <br />Department <br />Contact <br />Priority <br />Stormwater Utility <br />6 -Planned <br />Status Active <br />Total Project Cost: $398,200 <br />r <br />Reconstruction of streets in Stanhope Terrace: Ute Street, 153rd Lane, 154th Lane <br />North Forty: 163rd Lane, Alpaca st, Chameleon St. <br />Total Project Cost = $ 1,750,000 <br />Street Improvement: $1,351,800 <br />Storm Water Improvments: $ 398,200 *** <br />Justification <br />These streets are in poor condition and require reconstruction. The pavement has deteriorated beyond the point where an overlay could be <br />applied. This project will install concrete curb and gutter and storm sewer. <br />Expenditures <br />2016 2017 2018 <br />2019 <br />2020 <br />Total <br />Improvements Other than 398,200 <br />Building Cost <br />398,200 <br />Funding Sources <br />Total 398,200 <br />398,200 <br />2016 2017 2018 <br />2019 <br />2020 <br />Total <br />Storm Water Utility Fund 398,200 398,200 <br />Total 398,200 398,200 <br />138 <br />