Laserfiche WebLink
PRELIMINARY ENGINEER'S ESTIMATE <br />ANDRIE STREET AND 164TH LANE RECONSTRUCTION <br />NORTHFORK <br />CITY OF RAMSEY <br />January 7, 2016 <br />SCHEDULE A : STREET CONSTRUCTION <br />ESTIMATED <br />ESTIMATED <br />ESTIMATED <br />DESCRIPTION <br />QUANTITY <br />UNIT <br />UNIT <br />PRICE <br />AMOUNT <br />MOBILIZATION <br />1 <br />LS <br />$ <br />80,000.00 <br />$ 80,000.00 <br />CLEARING AND GRUBBING TREE <br />54 <br />TREE <br />$ <br />400.00 <br />$ 21,600.00 <br />REMOVE CONCRETE CURB AND GUTTER <br />143 <br />LF <br />$ <br />4.00 <br />$ 572.00 <br />REMOVE SEWER PIPE - STORM <br />1317 <br />LF <br />$ <br />10.00 <br />$ 13,170.00 <br />REMOVE CONCRETE DRIVEWAY PAVEMENT <br />982 <br />SF <br />$ <br />3.00 <br />$ 2,946.00 <br />REMOVE CONCRETE PAVEMENT <br />243 <br />SF <br />$ <br />3.00 <br />$ 729.00 <br />REMOVE BITUMINOUS DRIVEWAY PAVEMENT <br />676 <br />SY <br />$ <br />3.50 <br />$ 2,366.00 <br />REMOVE BITUMINOUS PAVEMENT <br />1149 <br />SY <br />$ <br />3.50 <br />$ 4,021.50 <br />REMOVE MANHOLE OR CATCH BASIN <br />25 <br />EA <br />$ <br />300.00 <br />$ 7,500.00 <br />REMOVE CONCRETE APRON <br />4 <br />EA <br />$ <br />300.00 <br />$ 1,200.00 <br />SAWING CONCRETE PAVEMENT - FULL DEPTH <br />132 <br />LF <br />$ <br />3.50 <br />$ 462.00 <br />SAWING BITUMINOUS PAVEMENT- FULL DEPTH <br />1389 <br />LF <br />$ <br />3.50 <br />$ 4,861.50 <br />SALVAGE SIGN <br />22 <br />EA <br />$ <br />75.00 <br />$ 1,650.00 <br />SALVAGE MAILBOX SUPPORT <br />66 <br />EA <br />$ <br />100.00 <br />$ 6,600.00 <br />TEMPORARY MAIL BOX CLUSTER <br />7 <br />EA <br />$ <br />1,000.00 <br />$ 7,000.00 <br />COMMON EXCAVATION (EV) <br />6785 <br />CY <br />$ <br />9.00 <br />$ 61,065.00 <br />SUBGRADE EXCAVATION (EV) <br />395 <br />CY <br />$ <br />10.00 <br />$ 3,950.00 <br />SELECT GRANULAR BORROW (CV) <br />500 <br />CY <br />$ <br />17.00 <br />$ 8,500.00 <br />COMMON TOPSOIL BORROW (Y) <br />1779 <br />CY <br />$ <br />22.00 <br />$ 39,138.00 <br />ROCK CONSTRUCTION ENTRANCE <br />2 <br />EA <br />$ <br />1,000.00 <br />$ 2,000.00 <br />HAUL & DISPOSE EXCESS MATERIAL (LV) <br />8616 <br />CY <br />$ <br />14.00 <br />$ 120,624.00 <br />HAUL& STOCKPILE EXCESS BITUMINOUS MATERIAL (LV) <br />5720 <br />CY <br />$ <br />10.00 <br />$ 57,200.00 <br />SUBGRADE PREPARATION <br />100 <br />RDST <br />$ <br />200.00 <br />$ 20,000.00 <br />AGGREGATE BASE CLAS 5 MODIFIED (CV) (P) <br />7852 <br />CY <br />$ <br />15.00 <br />$ 117,780.00 <br />MILL BITUMINOUS PAVEMENT (1" DEPTH) <br />106 <br />SY <br />$ <br />10.00 <br />$ 1,060.00 <br />BITUMINOUS PAVEMENT RECLAMATION (5" DEPTH) <br />34320 <br />SY <br />$ <br />2.50 <br />$ 85,800.00 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />1855 <br />GAL <br />$ <br />3.50 <br />$ 6,492.50 <br />TYPE SP 12.5 WEARING COURSE MIXTURE (SPWEB340B) (1.5") <br />3643 <br />TON <br />$ <br />70.00 <br />$ 255,010.00 <br />TYPE SP 12.5 NON -WEARING COURSE MIXTURE (SPNWB330B) (2") <br />4857 <br />TON <br />$ <br />65.00 <br />$ 315,705.00 <br />TYPE SP 12.5 BITUMINOUS MIXTURE FOR DRIVEWAYS (4") <br />160 <br />TON <br />$ <br />70.00 <br />$ 11,200.00 <br />IRRIGATION RESTORATION <br />60 <br />EA <br />$ <br />1,000.00 <br />$ 60,000.00 <br />6" CONCRETE WALK <br />200 <br />SF <br />$ <br />7.00 <br />$ 1,400.00 <br />CONCRETE CURB & GUTTER DESIGN B618 <br />20018 <br />LF <br />$ <br />12.00 <br />$ 240,216.00 <br />6" CONCRETE DRIVEWAY PAVEMENT <br />600 <br />SF <br />$ <br />7.00 <br />$ 4,200.00 <br />7" CONCRETE VALLEY GUTTER <br />315 <br />SY <br />$ <br />80.00 <br />$ 25,200.00 <br />TRUNCATED DOMES <br />40 <br />SF <br />$ <br />40.00 <br />$ 1,600.00 <br />INSTALL MAIL BOX SUPPORT <br />66 <br />EA <br />$ <br />250.00 <br />$ 16,500.00 <br />TRAFFIC CONTROL <br />1 <br />LS <br />$ <br />5,000.00 <br />$ 5,000.00 <br />SIGN PANEL TYPE C <br />90 <br />SF <br />$ <br />35.00 <br />$ 3,150.00 <br />INSTALL SIGN PANEL TYPE C <br />90 <br />EA <br />$ <br />100.00 <br />$ 9,000.00 <br />SILT FENCE, TYPE MS <br />2000 <br />LF <br />$ <br />3.00 <br />$ 6,000.00 <br />LANDSCAPE RESTORATION <br />1 <br />LS <br />$ <br />50,000.00 <br />$ 50,000.00 <br />FERTILIZER TYPE 3 <br />27 <br />LB <br />$ <br />2.10 <br />$ 56.70 <br />SEED MIXTURE 33-262 <br />5 <br />LB <br />$ <br />6.00 <br />$ 30.00 <br />SODDING TYPE LAWN <br />13350 <br />SY <br />$ <br />6.00 <br />$ 80,100.00 <br />DISKANCHORING <br />0.135 <br />ACRE <br />$ <br />200.00 <br />$ 27.00 <br />EROSION CONTROL BLANKET CATEGORY 3 <br />695 <br />SY <br />$ <br />3.00 <br />$ 2,085.00 <br />STORM DRAIN INLET PROTECTION <br />11 <br />EA <br />$ <br />200.00 <br />$ 2,200.00 <br />SEEDING <br />0.135 <br />ACRE <br />$ <br />1,500.00 <br />$ 202.50 <br />PAVT MSSG (BIKE LANE) -EPDXY <br />28 <br />EA <br />$ <br />250.00 <br />$ 7,000.00 <br />4" SOLID LINE WHITE - EPDXY <br />12775 <br />LF <br />$ <br />0.50 <br />$ 6,387.50 <br />TOTAL <br />STREET CONSTRUCTION: <br />$ 1,780,557.20 <br />Feasibility Report <br />Andrie Street and 164th Lane Reconstruction <br />City of Ramsey Project No. 16-00 Division C <br />