Laserfiche WebLink
SCHEDULE 8: STORM SEWER <br />ESTIMATED <br />ESTIMATED <br />ESTIMATED <br />DESCRIPTION <br />QUANTITY <br />UNIT <br />UNIT <br />PRICE <br />AMOUNT <br />POND EXCAVATION "STORM WATER PONDING" <br />6 <br />EA <br />$ <br />20,000.00 <br />$ 120,000.00 <br />UTLITY DEWATERING <br />1 <br />LS <br />$ <br />10,000.00 <br />$ 10,000.00 <br />GEOTEXTILE FABRIC TYPE IV <br />125 <br />SY <br />$ <br />3.00 <br />$ 375.00 <br />ROCK BEDDING (CV) <br />15 <br />CY <br />$ <br />25.00 <br />$ 375.00 <br />15" RC PIPE APRON <br />1 <br />EA <br />$ <br />650.00 <br />$ 650.00 <br />18" RC PIPE APRON <br />2 <br />EA <br />$ <br />800.00 <br />$ 1,600.00 <br />21" RC PIPE APRON <br />1 <br />EA <br />$ <br />900.00 <br />$ 900.00 <br />TRASH GUARD FOR 15" RC PIPE APRON <br />1 <br />EA <br />$ <br />350.00 <br />$ 350.00 <br />TRASH GUARD FOR 18" RC PIPE APRON <br />2 <br />EA <br />$ <br />400.00 <br />$ 800.00 <br />TRASH GUARD FOR 21" RC PIPE APRON <br />1 <br />EA <br />$ <br />450.00 <br />$ 450.00 <br />15" RC PIPE SEWER, DESIGN 3006 CLASS III <br />2899 <br />LF <br />$ <br />31.00 <br />$ 89,869.00 <br />18" RC PIPE SEWER, DESIGN 3006 CLASS III <br />527 <br />LF <br />$ <br />36.00 <br />$ 18,972.00 <br />21" RC PIPE SEWER, DESIGN 3006 CLASS III <br />44 <br />LF <br />$ <br />45.00 <br />$ 1,980.00 <br />24" RC PIPE SEWER, DESIGN 3006 CLASS III <br />47 <br />LF <br />$ <br />50.00 <br />$ 2,350.00 <br />CONNECT TO EXISTING STORM SEWER <br />3 <br />EA <br />$ <br />1,000.00 <br />$ 3,000.00 <br />15" HDPE PIPE SEWER <br />8 <br />LF <br />$ <br />40.00 <br />$ 320.00 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 2X3 CATCH BASIN <br />15 <br />EA <br />$ <br />1,800.00 <br />$ 27,000.00 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020 <br />20 <br />EA <br />$ <br />2,800.00 <br />$ 56,000.00 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 60-4020 <br />3 <br />EA <br />$ <br />4,000.00 <br />$ 12,000.00 <br />FURNISH ANDINSTALLCASTING - STORM <br />38 <br />EA <br />$ <br />1,000.00 <br />$ 38,000.00 <br />ADJUST FRAME AND RING CASTING <br />38 <br />EA <br />$ <br />400.00 <br />$ 15,200.00 <br />RANDOM RIP RAP CLASS III <br />30 <br />CY <br />$ <br />125.00 <br />$ 3,750.00 <br />TOTAL STORM SEWER <br />CONSTRUCTION <br />$ 403,941.00 <br />SUMMARY OF STREET RECONSTRUCTION WITH UTILITIES <br />TOTAL STREET CONSTRUCTION <br />$ 1,780,557.20 <br />TOTAL STORM SEWER CONSTRUCTION <br />$ 403,941.00 <br />10% CONTINGENCY <br />$ 218,449.82 <br />ENGINEERING (15%) ADMINSTRATIVE (6%) FINANCING AND LEGAL (2%) <br />$ 552,678.04 <br />TOTAL ESTIMATED PROJECT COST $ 2,955,626.06 <br />Feasibility Report <br />Andrie Street and 164th Lane Reconstruction <br />City of Ramsey Project No. 16-00 Division C <br />