Laserfiche WebLink
stormwater modeling during the design process. If needed, stormwater outlet pipes and ponding <br />facilities will be increased in size, and structural pollution control devices and/or surface <br />treatment improvements such as infiltration basins or trenches will be constructed. <br />The engineer for the Lower Rum River Watershed Management Organization will be consulted <br />to determine whether infiltration practices will be required with this project. <br />4.3 Water Main Improvements <br />No watermain work is proposed with this project. <br />4.4 Sanitary Sewer Improvements <br />No sanitary sewer work is proposed with this project. <br />4.5 Construction Methods <br />The existing bituminous pavement sections will be reclaimed by grinding approximately 5" off <br />the top of the existing bituminous pavement section, including the bituminous curb and <br />pavement and class 5 aggregate base. <br />Depending on whether the grade of the street needs to be adjusted to match the proposed profile, <br />up to a foot of the existing subgrade soils will be scarified and compacted in place prior to <br />placing the new aggregate base class 5 section. <br />Paving will be completed in two separate lifts. <br />4.6 Private Utilities <br />Staff has not yet met with the telephone, gas, and cable utilities regarding this project. During <br />preparation of plans and specifications, staff will meet with the private utility companies to <br />discuss the proposed improvements as noted in the project schedule within this report. The <br />alignment and footprint of the streets will be considered to minimize impacts to private utilities. <br />No impacts to power poles or street lights are anticipated with this project. <br />Should any of the utility companies indicate that they wish to upgrade, replace and/or otherwise <br />modify their services during this project, any such upgrades, replacements and/or modifications <br />will be at the sole discretion and cost of the private utility. <br />4.7 Permits <br />Permits that are anticipated to be required as part of the proposed improvements include: <br />• MPCA General Stormwater Permit (NPDES) Grading and Storm Water <br />• LRRWMO Permit WMO Stormwater Permit <br />4.8 Right-of-Ways/Easements <br />Feasibility Report <br />Andrie Street and 164th Lane Reconstruction <br />City of Ramsey Project No. 16-00 Division C <br />Page 12 <br />