Laserfiche WebLink
SCHEDULE A : STREET CONSTRUCTION <br />DESCRIPTION <br />PRELIMINARY ENGINEER'S ESTIMATE <br />ANDRIE STREET AND 164TH LANE RECONSTRUCTION <br />NORTHFORK <br />CITY OF RAMSEY <br />January 7, 2016 <br />ESTIMATED ESTIMATED ESTIMATED <br />QUANTITY UNIT UNIT PRICE AMOUNT <br />MOBILIZATION 1 LS $ 80,000.00 $ 80,000.00 <br />CLEARING AND GRUBBING TREE 54 TREE $ 400.00 $ 21,600.00 <br />REMOVE CONCRETE CURB AND GUTTER 143 LF $ 4.00 $ 572.00 <br />REMOVE SEWER PIPE - STORM 1317 LF $ 10.00 $ 13,170.00 <br />REMOVE CONCRETE DRIVEWAY PAVEMENT 982 SF $ 3.00 $ 2,946.00 <br />REMOVE CONCRETE PAVEMENT 243 SF $ 3.00 $ 729.00 <br />REMOVE BITUMINOUS DRIVEWAY PAVEMENT 676 SY $ 3.50 $ 2,366.00 <br />REMOVE BITUMINOUS PAVEMENT 1149 SY $ 3.50 $ 4,021.50 <br />REMOVE MANHOLE OR CATCH BASIN 25 EA $ 300.00 $ 7,500.00 <br />REMOVE CONCRETE APRON 4 EA $ 300.00 $ 1,200.00 <br />SAWING CONCRETE PAVEMENT - FULL DEPTH 132 LF $ 3.50 $ 462.00 <br />SAWING BITUMINOUS PAVEMENT- FULL DEPTH 1389 LF $ 3.50 $ 4,861.50 <br />SALVAGE SIGN 22 EA $ 75.00 $ 1,650.00 <br />SALVAGE MAIL BOX SUPPORT 66 EA $ 100.00 $ 6,600.00 <br />TEMPORARY MAIL BOX CLUSTER 7 EA $ 1,000.00 $ 7,000.00 <br />COMMON EXCAVATION (EV) 6785 CY $ 9.00 $ 61,065.00 <br />SUBGRADE EXCAVATION (EV) 395 CY $ 10.00 $ 3,950.00 <br />SELECT GRANULAR BORROW (CV) 500 CY $ 17.00 $ 8,500.00 <br />COMMON TOPSOIL BORROW (Y) 1779 CY $ 22.00 $ 39,138.00 <br />ROCK CONSTRUCTION ENTRANCE 2 EA $ 1,000.00 $ 2,000.00 <br />HAUL & DISPOSE EXCESS MATERIAL (LV) 8616 CY $ 14.00 $ 120,624.00 <br />HAUL& STOCKPILE EXCESS BITUMINOUS MATERIAL (LV) 5720 CY $ 10.00 $ 57,200.00 <br />SUBGRADE PREPARATION 100 RDST $ 200.00 $ 20,000.00 <br />AGGREGATE BASE CLAS 5 MODIFIED (CV) (P) 7852 CY $ 15.00 $ 117,780.00 <br />MILL BITUMINOUS PAVEMENT (1" DEPTH) 106 SY $ 10.00 $ 1,060.00 <br />BITUMINOUS PAVEMENT RECLAMATION (5" DEPTH) 34320 SY $ 2.50 $ 85,800.00 <br />BITUMINOUS MATERIAL FOR TACK COAT 1855 GAL $ 3.50 $ 6,492.50 <br />TYPE SP 12.5 WEARING COURSE MIXTURE (SPWEB340B) (1.5") 3643 TON $ 70.00 $ 255,010.00 <br />TYPE SP 12.5 NON -WEARING COURSE MIXTURE (SPNWB330B) (2") 4857 TON $ 65.00 $ 315,705.00 <br />TYPE SP 12.5 BITUMINOUS MIXTURE FOR DRIVEWAYS (4") 160 TON $ 70.00 $ 11,200.00 <br />IRRIGATION RESTORATION 60 EA $ 1,000.00 $ 60,000.00 <br />6" CONCRETE WALK 200 SF $ 7.00 $ 1,400.00 <br />CONCRETE CURB & GUTTER DESIGN B618 20018 LF $ 12.00 $ 240,216.00 <br />6" CONCRETE DRIVEWAY PAVEMENT 600 SF $ 7.00 $ 4,200.00 <br />T CONCRETE VALLEY GUTTER 315 SY $ 80.00 $ 25,200.00 <br />TRUNCATED DOMES 40 SF $ 40.00 $ 1,600.00 <br />INSTALL MAIL BOX SUPPORT 66 EA $ 250.00 $ 16,500.00 <br />TRAFFIC CONTROL 1 LS $ 5,000.00 $ 5,000.00 <br />SIGN PANEL TYPE C 90 SF $ 35.00 $ 3,150.00 <br />INSTALL SIGN PANEL TYPE C 90 EA $ 100.00 $ 9,000.00 <br />SILT FENCE, TYPE MS 2000 LF $ 3.00 $ 6,000.00 <br />LANDSCAPE RESTORATION 1 LS $ 50,000.00 $ 50,000.00 <br />FERTILIZER TYPE 3 27 LB $ 2.10 $ 56.70 <br />SEED MIXTURE 33-262 5 LB $ 6.00 $ 30.00 <br />SODDING TYPE LAWN 13350 SY $ 6.00 $ 80,100.00 <br />DISK ANCHORING 0.135 ACRE $ 200.00 $ 27.00 <br />EROSION CONTROL BLANKET CATEGORY 3 695 SY $ 3.00 $ 2,085.00 <br />STORM DRAIN INLET PROTECTION 11 EA $ 200.00 $ 2,200.00 <br />SEEDING 0.135 ACRE $ 1,500.00 $ 202.50 <br />PAVT MSSG (BIKE LANE) - EPDXY 28 EA $ 250.00 $ 7,000.00 <br />4" SOLID LINE WHITE - EPDXY 12775 LF $ 0.50 $ 6,387.50 <br />TOTAL STREET CONSTRUCTION: $ 1,780,557.20 <br />Feasibility Report <br />Andrie Street and 164th Lane Reconstruction <br />City of Ramsey Project No. 16-00 Division C <br />