My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/26/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 01/26/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:46:01 PM
Creation date
1/29/2016 10:22:37 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/26/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 8: STORM SEWER <br />DESCRIPTION <br />ESTIMATED ESTIMATED ESTIMATED <br />QUANTITY UNIT UNIT PRICE AMOUNT <br />POND EXCAVATION 'STORM WATER PONDING" 6 EA $ 20,000.00 $ 120,000.00 <br />UTLITY DEWATERING 1 LS $ 10,000.00 $ 10,000.00 <br />GEOTEXTILE FABRIC TYPE IV 125 SY $ 3.00 $ 375.00 <br />ROCK BEDDING (CV) 15 CY $ 25.00 $ 375.00 <br />15" RC PIPE APRON 1 EA $ 650.00 $ 650.00 <br />18" RC PIPE APRON 2 EA $ 800.00 $ 1,600.00 <br />21" RC PIPE APRON 1 EA $ 900.00 $ 900.00 <br />TRASH GUARD FOR 15" RC PIPE APRON 1 EA $ 350.00 $ 350.00 <br />TRASH GUARD FOR 18" RC PIPE APRON 2 EA $ 400.00 $ 800.00 <br />TRASH GUARD FOR 21" RC PIPE APRON 1 EA $ 450.00 $ 450.00 <br />15" RC PIPE SEWER, DESIGN 3006 CLASS III 2899 LF $ 31.00 $ 89,869.00 <br />18" RC PIPE SEWER, DESIGN 3006 CLASS III 527 LF $ 36.00 $ 18,972.00 <br />21" RC PIPE SEWER, DESIGN 3006 CLASS III 44 LF $ 45.00 $ 1,980.00 <br />24" RC PIPE SEWER, DESIGN 3006 CLASS III 47 LF $ 50.00 $ 2,350.00 <br />CONNECT TO EXISTING STORM SEWER 3 EA $ 1,000.00 $ 3,000.00 <br />15" HDPE PIPE SEWER 8 LF $ 40.00 $ 320.00 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 2X3 CATCH BASIN 15 EA $ 1,800.00 $ 27,000.00 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020 20 EA $ 2,800.00 $ 56,000.00 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 60-4020 3 EA $ 4,000.00 $ 12,000.00 <br />FURNISH AND INSTALL CASTING - STORM 38 EA $ 1,000.00 $ 38,000.00 <br />ADJUST FRAME AND RING CASTING 38 EA $ 400.00 $ 15,200.00 <br />RANDOM RIP RAP CLASS III 30 CY $ 125.00 $ 3,750.00 <br />TOTAL STORM SEWER CONSTRUCTION $ 403,941.00 <br />SUMMARY OF STREET RECONSTRUCTION WITH UTILITIES <br />TOTAL STREET CONSTRUCTION <br />TOTAL STORM SEWER CONSTRUCTION <br />10% CONTINGENCY <br />ENGINEERING (15%) ADMINSTRATIVE (6%) FINANCING AND LEGAL (2%) <br />TOTAL ESTIMATED PROJECT COST <br />1, 780, 557.20 <br />403,941.00 <br />218,449.82 <br />552,678.04 <br />2,955,626.06 <br />Feasibility Report <br />Andrie Street and 164th Lane Reconstruction <br />City of Ramsey Project No. 16-00 Division C <br />
The URL can be used to link to this page
Your browser does not support the video tag.