Laserfiche WebLink
I <br /> I <br /> I <br /> I <br /> I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Anoka County Board of Commissioners <br />Anoka County Court House <br />325 East Main Street <br />Anoka, ~4innesota 55303 <br /> <br />Subject: <br /> <br />Using the Landfill in Ramsey as the Site and to <br />Provide the Fuel for a Demonstration 40 kW Fuel <br />Cell Power Plant <br /> <br />Gentlemen: <br /> <br />The purpose of this letter is to request your assistance in <br />procuring a site to locate a demonstration 40 kilowatt (kW) <br />fuel cell power plant. We are aware of the County Board's <br />interest in and active pursuit of ways to make better use of <br />the renewable resource the landfill represents. We feel this <br />proposed project has significant potential for making better <br />use of that resource. The remainder of this letter consists <br />of three parts. <br /> <br />1. Description of the proposed project, <br /> <br />2. Description of potential benefits and future applications <br /> for Anoka County, <br /> <br />3. Costs to the county. <br /> <br />Description of the Proposed Project <br /> <br />United Power Association (UPA) is planning to submit a proposal <br />to the Federal Department of Energy (DOE) under DOE's program <br />for "Demonstrating the Technical Feasibility and Operability of <br />Fuel Cell Power Plants in Suitable On Site Integrated Energy <br />System Applications" (referred to as the 40 kW Fuel Cell <br />Program). In order to participate in the 40 kW Fuel Cell <br />Program we must nominate sites for locating and operating the <br />fuel cell power plant. DOE is very interested in finding renewable <br />sources of fuel (the 40 kW fuel cell requires natural gas as fuel). <br />Since landfill gas is considered renewable, we feel a fuel cell <br />power plant located on the landfill and using landfill gas for <br />fuel will be very attractive to DOE. <br /> <br />Assuming favorable action on your part we would take the following <br />steps with respect to the landfill site: <br /> <br />Nominate the site in our proposal to DOE. <br /> <br />Assuming a "winning" proposal we would; <br /> <br />A. determine any site preparation necessary to install <br /> and operate the power plant, <br /> <br /> <br />