Laserfiche WebLink
,I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> <br /> CHANGE ORDER NO. 3 <br /> TO <br /> CONSTRUCTION CONTRACT FOR <br /> IMPROVEMENT PROJECT 82-1 <br /> S.A.P. 199-102-01 <br />STREET CONSTRUCTION 167TH AVENUE N.W. <br /> CITY OF RAMSEY, MINNESOTA <br /> <br />September 22, 1982 Hakanson Anderson Associates, Inc <br /> <br />The City has decided to change or add the following items of work to the contract for <br />this project: <br /> Decrease Increase <br /> Changes ,, in Contract Price in Contract Price <br /> <br />I. Delete 32 Linear Feet of <br /> 30" CMP at $16.00/LF <br /> <br />$512.00 <br /> <br />2. Delete3 - 30" CMP Flared End ~ <br /> Sections at $140.O0/EA <br /> <br />420.00 <br /> <br />Add l0 Linear Feet of 24" CMP <br />at $27.50/LF <br /> <br />Add 22 Linear Feet of 36" CMP <br />at $40.O0/LF <br /> <br />Add 1 - 24" CMP Flared End <br />Section at $125.00/EA <br /> <br />$ 275.00 <br /> <br />880.00 <br /> <br />125. O0 <br /> <br />6. Add 2 - 36" CMP End Sections <br /> at $300.O0/EA <br /> <br />600.00 <br /> <br />I <br />I <br /> <br />o <br /> <br />Add 4500 Cu. Yds. (LV) of <br />Common Borrow @ $3.05/Cu. Yd. <br /> <br />Totals - <br /> <br />Net Change in Contract Price - <br /> <br />$932.00 <br /> <br />13,725.00 <br /> <br />$15,605.00 <br />$14,673.00 <br /> <br />I <br />I <br />I <br />I <br /> <br />Description and Location of Work: The proposed revisions consists of changing the 30 <br />inch culvert extension at station 40+20 to a 36 inch diameter and also changing the 30 <br />inch culvert extension crossing S.T. Highway No. 47 to a 24 inch diameter. <br /> <br />The common borrow is required to fill the subcut area between stations 27+00 to <br />38+00. <br /> <br />Page 1 of 2 <br /> <br /> <br />