Laserfiche WebLink
ORDER ;~3. 3 (continued) <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />September 22, 1982 Hakanson Anderson Associates, Inc. <br /> <br />All work shall be done in accordance with the contract documents or as directed by <br />the engineer. <br /> <br />Necessity for ChanCe Order No. 3: The changes in the culvert pipe diameters were <br />required to match the existing culverts. These culverts were inadvertently shown <br />incorrectly on the plans. <br /> <br />The need for the common borrow was due to required additional subgrade correction <br />between stations 27+00 and 33+00. Also a majority of the common excavation on the <br />project was unsuitable for road building purposes as originally proposed. <br /> <br />The amount of the Contract will be (De6Fease~) (Increased) by the Sum of: Fourteen <br /> <br />Thousand six hundred seventy-three and O0/lO0 Dollars ($14,673.~0). <br /> <br />The Contract Total Including this Change Order Will Be: Two hundred one thousand <br /> <br />four hundred forty=eight and 56/100 Dollars ($201,448.56). <br /> <br />The Contract Period Provided for Completion Will Be (~eFease~) (BeeFease~) (Unchanged): <br /> <br />This document will become a supplement to the contract and all provisions will apply <br /> <br />hereto. <br /> <br />It is understood that this agreement is not valid until the appropriate signatures are <br />affixed. <br /> <br />CONTRACTOR: U.D. Contracting, Inc. <br /> <br /> Title: <br /> <br />ENGINEER: Hakanson Anderson Associates, Inc. <br /> <br /> Title: <br /> <br />OWNER: City of Ramsey <br /> <br /> Title: <br /> <br />Date: <br /> <br />Date: <br /> <br />Date: <br /> <br />File: RA3:l 5-1 <br /> <br />Page 2 of 2 <br /> <br /> <br />