My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/21/1982
Ramsey
>
Public
>
Agendas
>
Council
>
1982
>
Agenda - Council - 12/21/1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 12:33:26 PM
Creation date
5/20/2004 8:50:42 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/21/1982
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />! <br />I <br />I <br />I <br /> <br />Survey, no subgrade correction is anticipated in reconstructing <br />the roadway. A copy of the soil borings is attached for your <br />reference. <br /> <br />PROPOSED IMPROVEMENT: ~' <br /> <br />Variolite Street and 155th Avenue N.W. are proposed to be constructed , <br />to MS~S standards. The ultimate improvement would provide for a <br />bituminous surfaced rural street section. The improvement would <br />require acquisition of additional right-of-way to increase the <br />existing right-of-way width to a minimum of 80 feet. In addition <br />to the permanent right-of-way, slope easements would also be <br />required for a portion of the project. Tree removal is also <br />anticipated in some areas since the proposed street section width <br />exceeds the present street width. <br /> <br />It is proposed to locate 155th Avenue N.W. along the one-sixteenth <br />line o£ Section. 21. The construction of Variolite Street is pro- <br />posed to be c e~ered 40 feet east of the section quarter lines. <br />This would allow for the utilization of the existing 80 feet of <br />right-of-way along the Traprock Commons plat. <br /> <br />The ultimate street section would include three and one-half inch <br />thick, 24 feet wide bituminous surface over a four inch class five <br />gravel base with eight foot wide two inch thick bituminous shoulders <br />as shown on Exhibit B. It is also proposed to widen the right <br />shoulder to 12 feet at the intersection of 155th Avenue and Ramsey <br /> <br />- 2 - <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.