Laserfiche WebLink
! <br />:! <br /> <br />! <br />! <br /> <br />,m <br /> m <br /> I <br />,m <br /> m <br /> I <br /> I <br /> I <br /> m <br /> m <br /> m <br /> I <br /> <br />Boulevard for use as a turning lane. <br /> <br />Storm water drainage would also be provided. The existing <br />drainage culverts would be salvaged and reused depending upon <br />their condition. Where culverts do not presently exist, -it is <br />proposed to install new cross street culverts as required to <br />convey the storm water runoff. Several driveways also do not <br />presently have driveway culverts. In the event the drainage <br />patterns are changed and driveway culverts are required, they <br />would also be installed as part of the project. At the inter- <br />section of 158th Avenue and Variolite Street, it is proposed to <br />construct storm sewer to provide a drainage outlet. It is also <br />proposed to obtain drainage easements, since no easements outside <br />of the street right-of-way presently exist.' <br /> <br />ESTIMATED COSTS' <br /> <br />The estimated project costs are shown in the following table' <br /> <br />Table 1 - Estimated Costs <br /> <br />Item <br /> <br />Estimated Cost <br /> <br />Excavation, Grading <br />Gravel Surfacing <br />Bituminous Base Course <br />BituminOus Wear Course <br />Restoration <br />Drainage Improvements <br /> <br />Total Construction Cost - <br /> <br />$28,000.00 <br />36,000.00 <br />29,600.00 <br />72,200.00 <br />7,200.00 <br />16,000.00 <br /> <br />$189,000.00 <br /> <br />Contingencies, Engineering, Administrative & <br />Right-of-Way Acquisition <br /> <br />52 900.00 <br /> <br />TOTAL ESTIMATED COST - <br /> <br />$241,900.00 <br /> <br /> <br />