My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/21/1982
Ramsey
>
Public
>
Agendas
>
Council
>
1982
>
Agenda - Council - 12/21/1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 12:33:26 PM
Creation date
5/20/2004 8:50:42 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/21/1982
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
! <br />:! <br /> <br />! <br />! <br /> <br />,m <br /> m <br /> I <br />,m <br /> m <br /> I <br /> I <br /> I <br /> m <br /> m <br /> m <br /> I <br /> <br />Boulevard for use as a turning lane. <br /> <br />Storm water drainage would also be provided. The existing <br />drainage culverts would be salvaged and reused depending upon <br />their condition. Where culverts do not presently exist, -it is <br />proposed to install new cross street culverts as required to <br />convey the storm water runoff. Several driveways also do not <br />presently have driveway culverts. In the event the drainage <br />patterns are changed and driveway culverts are required, they <br />would also be installed as part of the project. At the inter- <br />section of 158th Avenue and Variolite Street, it is proposed to <br />construct storm sewer to provide a drainage outlet. It is also <br />proposed to obtain drainage easements, since no easements outside <br />of the street right-of-way presently exist.' <br /> <br />ESTIMATED COSTS' <br /> <br />The estimated project costs are shown in the following table' <br /> <br />Table 1 - Estimated Costs <br /> <br />Item <br /> <br />Estimated Cost <br /> <br />Excavation, Grading <br />Gravel Surfacing <br />Bituminous Base Course <br />BituminOus Wear Course <br />Restoration <br />Drainage Improvements <br /> <br />Total Construction Cost - <br /> <br />$28,000.00 <br />36,000.00 <br />29,600.00 <br />72,200.00 <br />7,200.00 <br />16,000.00 <br /> <br />$189,000.00 <br /> <br />Contingencies, Engineering, Administrative & <br />Right-of-Way Acquisition <br /> <br />52 900.00 <br /> <br />TOTAL ESTIMATED COST - <br /> <br />$241,900.00 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.