Laserfiche WebLink
I <br /> I <br /> I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />! <br />I <br /> <br />of 40 gallons, l{owever, the existing unit shall remain in place to not <br />only meet future demands but provide a tempering tank in the interim. <br />Therefore, the new unit shall be piped in line behind the existing heater. <br />~]e contractor shall verify the location of all existing construction to <br />familiarize himself with the work to be performed. <br /> <br />The quotation shall include the costs of all material and equipment, labor, <br />wiring, and incidental work to render the unit functional, including the <br />insulating of the piping. The contractor shall also submit with his quota- <br />tion manufacturer's literature on the equipment to be supplied. <br /> <br />6) Install Cabana Fans in Foyer Area <br /> <br />The foyer/lobby area was constructed with an additional ceiling height to <br />allow for ~he installation of inverted trusses and provide for structural <br />aesth~tics. However, air stratification occurs in this area, creatin9 an <br />ideal heat loss situation, as no means of circulating this air were provided. <br /> <br />The contractor shall fm3nish and install two cabana fans, 54" minimum dia- <br />meter, in the foyer area where specified by the City. The quotation for <br />this ~n~ta]lation shall include all materials and labor as well as the nec- <br />essary wiring and switching. The contractor shall include with his quotation <br />manufacturer's literature of the equipment to be installed. <br /> <br />C RB: po <br /> <br /> <br />