My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/23/1982
Ramsey
>
Public
>
Agendas
>
Council
>
1982
>
Agenda - Council - 03/23/1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 12:28:57 PM
Creation date
5/20/2004 11:17:13 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/23/1982
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
! <br />I <br />I <br /> <br /> I <br /> I <br /> I <br /> i <br /> i <br />:1 <br /> I <br />'1 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> ! <br /> <br />I, the undersigned, do hereby attest that I have read and full)' understand <br />the provisions set forther in regards to the attached requests for quotations. <br /> <br />Signature <br /> <br />1) ~uotatJon for Storm Panels <br /> <br />The contractor shall fabricate and install two class storm panels approximately <br />76" × 90". The panels shall be so constructed as to allow for removal, as <br />occasional cleaning will be necessary. The contractor shall verify all di- <br />mensions and provJ, de shop drawings for evaluation in awarding of the quotation. <br /> <br />2) .C~a~_l~te Air I,ock at ~4ain Entry to Building <br /> <br />The contractor shall complete the air lock located at the main entry to City <br />}Tall. Construction shall be of glass and framing mater~al compatible with <br />the existing construction so as to not destroy the aesthetics of the structure. <br />The contractor shall provide shop drawings of his proposed construction and <br />verify all dimensions in the field. The contracto~ is advised that the re- <br />lo~ation of the existing exit sign and ceiling lighting (if required) shall <br />be included as a part of his quotation. <br /> <br />3) Replace Thermostats- Fire Barn <br /> <br />The temperature controls in the City Hall fire barn presently consist of four <br />thermostats with ~ minimum temperature setting of about 60° fahrenheit. In- <br />asmuch as this is only a garage area and used only as such, these temperature <br />settings grossly exceed those required. Therefore,~ the contractor shall fur- <br />nish and install four each replacement thermostats with temperature settings <br />to a low of 35" fahrenheit. The thermostats shall be of the same manufacturer <br />as existing (Honeywell) or an approved equal. The contractor shall submit <br />with his quotation the manufacturer's literature on the equipment to be pro- <br />vided. The quotation shall include the cost of the equipment and installation. <br /> <br />4) Install Timer - Air Exchange Unit <br /> <br />The air exchange unit which provides makeup air as well as air conditioning is <br />provided with a manual day/night switch to shut the systems down. However, <br />the inconvenience of having to manually operate the systemwarrents the instal- <br />lation of a 24-hour timer so automatic operation can be attained. Therefore, <br />the contractor shall furnish and install a 1 to 24 hour adjustable timer with <br />a manual override. The quotation shall include the costs of the equipment and <br />installation. Manufacturer's literature shall be included with the quotation. <br /> <br />5) Furnish and Install Hot Water Heater <br /> <br />The City presently has an electric hot water heater which far exceeds the ca- <br />pacity necessary for the minimal needs at City Hall. To conserve energy, the <br />City has decided to install an electric hot water heater with a minimum capacity <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.