My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/22/1982
Ramsey
>
Public
>
Agendas
>
Council
>
1982
>
Agenda - Council - 02/22/1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 12:28:21 PM
Creation date
5/20/2004 11:30:41 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/22/1982
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of 40 gallons. However, the existing unit shall remain in place to not <br />only meet future demands but provide a tempering tank in the interim. <br />Therefore, the new unit shall be piped in line behind the existing heater. <br />The contractor shall verify the location of all existing construction to <br />familiarize himself with the work to be performed. <br /> <br />The quotation shall include the costs of all material and equipment, labor, <br />wiring, and incidental work to render the unit functional, including the <br />insulating of the piping. The contractor shall also submit with his quota- <br />tion manufacturer's literature on the equipment to be supplied. <br /> <br />6) Install Cabana Fans in Foyer Area <br /> <br />The foyer/lobby area was constructed with an additional ceiling height to <br />allow for the installation of inverted trusses and provide for structural <br />aesthetics. However, air stratification occurs in this area, creating an <br />ideal heat loss situation, as no means of circulating this air were provided. <br /> <br />The contractor shall furnish and install two cabana fans, 54" minimum dia- <br />meter, in the foyer area where specified by the City. The quotation for <br />this installation shall include all materials and labor as well as the nec- <br />essary wiring and switching. The contractor shall include with his quotation <br />manufacturer's literature of the equipment to be installed. <br /> <br />CRB: po <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.