My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 02/04/2016
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2016
>
Agenda - Planning Commission - 02/04/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:24:48 AM
Creation date
4/4/2016 4:27:10 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
02/04/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEVELOPMENT UPDATE <br />City of #k <br />RAMSEY <br />January 28, 2016 <br />The following are brief updates regarding development projects located within the community. For more detailed information, <br />please contact the Community Development Department at 763-433-9824, plannina@cityoframsey.com or see this report online <br />at www.cityoframsey.com/DevelopmentUpdate. <br />Brookfield Addition (Nowthen Boulevard and 170th Avenue) <br />Work on the required improvements for Brookfield 4th and 5th Addition has been completed. Permits have been issued for all <br />lots within both additions. Work is substantially completed on required improvements for 6th Addition. The Developer will be <br />required to install the second lift of asphalt in spring. The City has issued permits for eight (8) of the nineteen (19) lots in sixth <br />addition. <br />Casey's General Store (7222 Sunwood Dr NW) <br />Casey's General Store has now opened to customers. <br />Dedicated Networks (14100 Unity St NW) <br />This 20,000 square foot industrial expansion is currently under construction. Footings, foundation, fire suppression, and <br />electrical have been completed. Work continues on the building shell and interior floor layout. <br />Harvest Estates (15200 Helium St NW) <br />Work on the required public infrastructure for the first phase (32 lots) of this 44 lot single-family subdivision is largely complete. <br />The Developer will be required to install the final lift of asphalt in spring. The City has issued permits for two (2) dwellings for <br />this development (one of which was for model home). <br />The Developer has requested a one-year extension for Phase 2 (12 lots), which will be considered by the City Council in the <br />near future. <br />Life Fitness (14150 Sunfish Lake Blvd NW) <br />This 50,000 square foot industrial expansion is currently under construction. Site work is substantially complete. Work continues <br />on the building shell and interior floor plan. The Owner desires to have a Grand Opening of the expansion in early March. Final <br />site work will be completed in spring. <br />www.cityafra msey.cam <br />
The URL can be used to link to this page
Your browser does not support the video tag.