Laserfiche WebLink
Engineer Raatikka reviewed his report. <br /> <br />Chairman Peterson asked if they wanted their buildings in the commercial <br />strip adjacent to Highway #10 facing Highway #10 or the commercial area <br />or if they would face.both sides of the buildings. <br /> <br />He said that the Commissioners are concerned about the sight of Ra~s_sey <br />as you drive along Highway #10. <br /> <br />Ron West said that plans were to have it face Highway #10 and have the <br />back side dressed up as well as the front. <br /> <br />A discussion was held. <br /> <br />Regarding Item No. 1 of Engineer Raatikka~s letter of review dated <br />8/29/79, the residential 'lots in Block 9 should be changed to 13 lots <br />with a minimum frontage of 200 feet leaving a public access where it is <br />shown on the plan and that it will have to meet the codes and standards <br />for such access. <br /> <br />Regarding Item No. 3, a variance is necessary in order to have two 1,000 <br />foot long cul de sacs. <br /> <br />Engineer Raatikka stated that they should find out Where the water table is. <br /> <br />P & Z Commission recon~ended that they proceed with the preliminary plat <br />incorporating the cha~ges...that have been discussed at this meeting. <br /> <br />BERG OIL SITE PLAN/DESIGN PLAN REVIEW <br /> <br />Ron West was present representing Berg Oil Company. He stated that they <br />want to construct another building on the northwest rear corner of the <br />property for truck parking and general repairs and to park the trucks out <br />of the wi~d in the winter. <br /> <br />One of Mr. West's concerns is whether or not they need to provide for a <br />service drive so they Can determine where the building could best be located. <br />If a service road is planned for behind the oil company i% would take 20 <br />to 30 feet off of Kovar's loading dock and also take off part of the Tec <br />Center and BezgOil's parking lot if the road were to be aligned to rmn along <br />the back of the properties. If the road is planned for in front of these <br />properties, it will take off part of the Tec Center's main entrance. <br /> <br />A general discussion wa5 held concerning the service road and the problem <br />that would be encountered with either front or rear installation of the road. <br /> <br />Art Dunn expressed concern that with additional construction on this <br />property that it will use up the parking space and space that may be <br />necessary for operation of the septic system. <br /> <br />Chairman ?eterson stated that one of his concerns is the dropping off of <br />school children on Highway 10, and traffic with people pulling out of <br />Bergs, Kovar Manufacturing and the Tec Center. <br /> <br />Mr. Deemer suggested that the service road be lined up from Tumgsten Street <br />and go North. <br /> <br /> Regular P & Z Meeting - 9~4/~-79 <br /> <br /> <br />