My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 05/05/2016
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2016
>
Agenda - Planning Commission - 05/05/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:25:25 AM
Creation date
5/11/2016 8:36:56 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
05/05/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised Preliminary Plat and Preliminary Site Plan Review: Ramsey Town Center 6th Addition <br />July 3, 2007 <br />Revised: July 19, 2007 <br />Page 3 of 5 <br />9. Utilities: This subdivision will be served by sanitary sewer and city water services that will <br />be extended into the development. The watermain stubs on each segment of 145th Place must <br />be connected through the infiltration basin. Additional valves must be added to keep the <br />number of units impacted to a minimum if the water must be shut off. The city standard is a <br />maximum of 10-15 units with out water by closing 2 valves. <br />The typical townhome sewer and water service detail must be verified with the fire <br />department and building department. The 2x2 post on the irrigation detail must be replaced <br />with a "Blue Carsonite Marker". <br />The inverts of the storm sewer entering the infiltration area must be within 1.0 ft of the <br />bottom of the basin. The upstream structure may need to be deepened to maintain a flat slope <br />and minimize the energy of the water entering the basin <br />Continuation references and sheet overlap must be provided on all sheets. These plans are <br />the basis for the city as -built records that will be maintained for fine reference on utility <br />connections. ♦® <br />10. Tree Preservation. A tree preservation plan was approved t t nal plat stage of the <br />Ramsey Town Center Addition. There was a limited amo trees originally located on <br />this parcel prior to development and the trees that did exist were removed as part of the <br />approved tree preservation plan. <br />11 Sidewalks. The showing a system of internal sidewalks which will provide <br />connectivity througho the site, and connecting to other parts of the Town Center. Sidewalk <br />construction will need to be coordinated with City Staff throughout the site development <br />process. <br />12. Park Dedication/Trail Developm t: The Ramsey Town Center project is covered by the <br />Master Development Agreement d Parks Agreement. Per those agreements, Park <br />Dedication requirements are satisfied for Ramsey Town Center 6th Addition. <br />13. Traffic Generation: As part of the Town Center AUAR, a detailed traffic analysis was <br />completed that anticipated the type and size of development shown on the plat. The proposed <br />development is consistent with the traffic modeling system used as part of the AUAR <br />analysis. Regional road improvements to facilitate the whole Ramsey Town Center <br />development have been agreed upon and have already begun construction. This proposed <br />development does not generate more traffic than was anticipated. <br />14. Stormwater Trunk Fees: The 2007 Stormwater Trunk Fee is $416.00 per unit. This fee <br />will need to be paid prior to the release of the final plat for recording. <br />
The URL can be used to link to this page
Your browser does not support the video tag.