My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 05/05/2016
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2016
>
Agenda - Planning Commission - 05/05/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:25:25 AM
Creation date
5/11/2016 8:36:56 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
05/05/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Final Plat and Final Site Plan Review: Gables Terrace <br />March 4, 2008, Revised June 17, 2008 <br />Page 3 of 6 <br />of the Ramsey Town Center 7th Addition by K. Hovanian, but the second lift of <br />bituminous still needs to be applied and the right-of-way still needs to be dedicated to <br />the City. 146th Avenue N.W. is not a legal access at this time. Quartz Way and <br />Peridot Terrace will need to be barricaded from 146th until the right-of-way is <br />dedicated. <br />Rhinestone Street N.W. is complete and will provide access to the Gables. <br />8. Grading and Drainage: Staff has received a grading and drainage plan for the <br />development and has the following comments. The rock construction entrance on the <br />SWPPP should be replaced with the requirement for daily sweeping of adjacent <br />streets during active construction on the site. A sweeper is required on site or the <br />ability to obtain one within 3 hours. Dust control ma be necessary; grading may not <br />place take if wind speed exceeds 25mph. The res' lity for the SWPPP on this <br />site must be transferred to the new owner and n ctor prior to commencing <br />construction. <br />4�/1 <br />Benchmarks are called out on the plan. They must be tied to the Ramsey Town Center <br />Benchmark map prepared by Hakanson Anderson & Associates, Inc. <br />9. Utilities: The typical townhome sewer and water service derail must be verified with <br />the fire department and b d' g department. The 2x2 post on the irrigation detail <br />must be replaced with a rsonite Marker" before the project will be accepted <br />by the City. <br />Sheet 3.1 All tr r wire will be 10 gua_ copper wire — plan and profile sheets <br />must be provided for all <br />Sheet 4.1 Private irrigation eeve e eel post, add 2x2 or equivalent with <br />locator wire; pro ` le sheets for each street. <br />Sheet 6.1,6.2: Add logo to ci ails, S '• -6 needs to be upgraded, cross gutter <br />detail needs to be up, aded STR-2, curb and gutter detail required <br />STR-1. <br />The city requires an electronic file of the construction plans in CAD format to be <br />submitted at the preconstruction meeting prior to construction. <br />10. Tree Preservation. A tree preservation plan was approved at the final plat stage of <br />the Ramsey Town Center Addition. There was a limited amount of trees originally <br />located on this parcel prior to development and the trees that did exist were removed <br />as part of the approved tree preservation plan. <br />11. Sidewalks. The plan is showing a system of internal sidewalks which will provide <br />connectivity throughout the site, and connecting to other parts of the Town Center. <br />Sidewalk construction will need to be coordinated with City Staff throughout the site <br />
The URL can be used to link to this page
Your browser does not support the video tag.