Laserfiche WebLink
Utility Supervisor Nelson explained that with the Flint, Michigan situation, they had been <br />purchasing water from Detroit and then went with a surface water system. Flint's water main is <br />very old and many service lines from the water main to the house are made of lead. He <br />explained that when Flint switched its water supply, the water was more acidic so it ate away the <br />water main system and released lead into the water supply. Utility Supervisor Nelson stated all <br />of Ramsey's water lines are copper or Endopure plastic so lead is not an issue. <br />Utility Supervisor Nelson presented the information contained within the 'On Call Bible,' noting <br />that during off hours, one employee is always on -call to handle emergency situations. He stated <br />the Supervisory Control & Data Acquisition (SCADA) System (water tower control system) can <br />be checked and controlled remotely through cellular telephones and entering a secured password. <br />In that way, it can prevent an on -call employee from having to respond during off hours. <br />Public Works Superintendent Riemer stated this feature has saved the City a lot in overtime <br />costs. <br />Councilmember Johns asked if everyone takes a turn with the on -call schedule. <br />Utility Supervisor Nelson explained that once a year, employees pick the time to be on -call. <br />Public Works Superintendent Riemer clarified that all employees are not scheduled for on -call <br />but eight or nine employees have elected to do so. He provided a demonstration of the water and <br />sewer system information he can monitor remotely and explained how an IT contract service <br />manages the software. <br />Chairperson Riley asked if only one pump is run during the winter months. <br />Utility Supervisor Nelson responded in the affirmative and stated in the summer months, <br />irrigation is a large water user. <br />Chairperson Riley asked about 2006 through 2015, noting the water pumped is consistent even <br />though the City's population increased. <br />Utility Supervisor Nelson stated that while he hopes it has to do with conservation, it may have <br />more to do with wet summers. He reviewed the City's educational efforts and conservation <br />measures through odd/even sprinkling. Utility Supervisor Nelson explained a constant leak can <br />be detected when the water meter has constant movement, 24 hours a day, for 35 days in a row. <br />There can also be intermittent leaks. Staff sends out leak alert letters to 100 to 150 homes per <br />quarter. <br />Chairperson Riley stated several years ago, there was talk about replacing a pump within a well <br />with a variable model that would save electricity. <br />Utility Supervisor Nelson stated that was done with Well #4, which was designed to run 1,300 <br />gallons per minute. Then later it was found it also pumped sand, which would end up wearing <br />out the pump. Because of that, staff partially shut a valve to reduce the flow but that was hard on <br />Public Works Committee / March 15, 2016 <br />Page 3 of 8 <br />