Laserfiche WebLink
BKV <br />GROUP <br />CHANGE ORDER <br />AIA DOCUMENT G701 <br />Architecture Interior Design Landscape Architecture Engineering <br />Phone: 612.339.3752 Fax: 612.339.6212 www.bkvgroup.com <br />Enriching Lives and Strengthening Communities <br />Owner: X <br />Architect: X <br />Consultant: <br />Contractor: X <br />Field: <br />Other: <br />THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH <br />RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA <br />DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. <br />PROJECT: CHANGE ORDER NO.: 04-MATERIAL <br />Ramsey Fire Station #2 <br />5650 Alpine Drive NW <br />Ramsey, MN 55303 DATE OF ISSUANCE: 4/13/16 <br />OWNER: <br />City of Ramsey ARCHITECT'S PROJECT #: 1937.01 <br />7550 Sunwood Drive <br />Ramsey, MN 55303 <br />CONTRACT DATE: April 15, 2015 <br />ARCHITECT: <br />Boarman Kroos Vogel Group <br />222 N. 2nd Street CONTRACT FOR: General Construction <br />Minneapolis, MN 55401 <br />TO CONTRACTOR: <br />Brennan Construction of MN <br />5985 Brandel Rd NW <br />Mankato, MN 56001 <br />The contract is changed as follows: <br />(Include, where applicable, any undisputed amount attributable to previously executed Construction Change <br />Directives) <br />RFP # Subject Material <br />1 CR 24 Raise Sprinkler Line Add $33 <br />2 CR 32 Add Soffit at two exterior opening — RFI 59 Add $271 <br />3 CR 33 Install 2 bollards in storage 106 — Owner Add $350 <br />request <br />4 CCD 2 Annunciator Panel — misc lighting upgrades Add $1,477 <br />5 PR 16 WiFi Card Reader— Owner request Add $6,891 <br />6 CR 36 OH Door Remote Controls Add 803 <br />TOTALS: ADD $ 9,825 <br />ADD (0) Days <br />BKV Group, Inc. <br />