Laserfiche WebLink
The original Contract Sum was <br />Net change by previously authorized Change Orders <br />The Contract Sum prior to this Change Order was <br />The Contract Sum will be (increased)(dccr -oscd)(unchangcd). by this change order in the <br />amount of <br />The new Contract Sum including this Change Order will be <br />The Contract time will be (increoscd)(dccreoscd)(unchanged) by (0) days. <br />The date of Substantial Completion as of the date of this Change Order therefore is: <br />$ 1,685,000 <br />$ 30,091 <br />$ 1,712,820 <br />$ 9,825 <br />$ 1,722,645 <br />March 15, 2016 <br />NOTE: This summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed Maximum Price <br />which have been authorized by Construction Change Directive until the cost and time have been agreed upon by <br />both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change <br />Directive. <br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER: <br />ARCHITECT <br />Boarman Kroos Vogel Group, Inc. <br />Address <br />222 N. 2nd Street_ <br />Minneapolis, MN 55401 <br />BY <br />Bruce Schwartzman <br />DATE <br />CONTRACTOR <br />Brennan Construction of MN <br />Address <br />5985 Brandel Rd NW <br />Mankato, MN 56001 <br />BY <br />OWNER <br />City of Ramsey <br />Address <br />7550 Sunwood Drive <br />Ramsey, MN 55303 <br />BY <br />Joe Brennan Matt Kohner <br />DATE DATE <br />AIA DOCUMENT G701 * CHANGE ORDER * 2001 EDITION * AIA - COPYRIGHT 2001 * <br />THE AMERICAN INSTITUTE OF ARCHITECT'S, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006-5292 <br />WARNING; Unlicensed photocopying violates U.S. copyright law and is subject to legal prosecution. This document was <br />electronically produced with permission of the AIA and cannot be reproduced without violation until the date of <br />expiration noted below. <br />BKV Group, Inc. <br />