Laserfiche WebLink
Review File: The Woodlands 3rd Addition <br />Final Sanitary Sewer, Watermain, Storm Sewer and Street Plans <br />Engineering Review <br />June 8, 2016 <br />Page 2 of 3 <br />1. All symbols used on each sheet must be shown in the legend on that sheet. Existing and <br />proposed water services are shown with the same line type and must be changed. <br />2. Add street names in plan view <br />3. Add valve at station 7+50, near bend. City policy is no more than 11 lot between valves. <br />4. All 6" hydrant leads are Class 53 DIP. <br />5. Add continuation note "See Sheet XX" where plan view is continued on another page. <br />6. Remove note regarding 1st addition services. <br />7. Services shall end 10 feet beyond the edge of sidewalk. Services on the non -sidewalk side <br />shall end at the property line. <br />8. Add "Remove Plug" to Connect to Existing 8" Watermain. <br />9. Move the label for EXMH 5 to be readable in plan view. <br />10. Add insulation between water services and storm sewer for lots 11-14. <br />11. Callout 8" gate valve at intersection of Sapphire Street and 160th Ave with stationing. <br />Storm Sewer Construction Plans We offer the following comments: <br />1. Align plan view stationing with profile view stationing. <br />2. Move the CB labels to be adjacent to the structure in profile view. <br />3. Remove construction details and notes related to pond outlet structures. The structures can <br />be shown as screened for informational purposes with structure description. <br />4. The rip rap symbol must be darker on these sheets where it is part of this contract. <br />5. Add note to storm profiles denoting plan view page. <br />6. Add street names and continuation notes to plan view. <br />7. Hydraulic Grade calculations must be submitted for the storm sewer system. <br />A copy of the MPCA Construction Stormwater permit must be submitted to the City along with a <br />copy of the inspection records required by the SWPPP. <br />Street Construction Plans We offer the following comments: <br />1. Align plan view stationing with profile view stationing. <br />2. Add legend to sheet showing all symbols used on the sheet. <br />3. Ghost in all utilities in profile views. <br />4. Ghost in all utilities in plan views. <br />5. Revise bituminous mix designs to reflect MNDOT 2360 mix designations. <br />6. Truncated domes must be radial at curb. <br />7. Continuation notes need to be revised to point to the correct page. <br />Details — <br />1. Add note to Detail STO-4 "Mark all manholes outside paved areas with green carsonite <br />marker." <br />2. Add Ditch Block Detail. <br />3. Remove 6" Cleanout Detail. <br />4. A detail with lengths, elevations and slopes is required for each pedestrian ramp. This is <br />in addition to the 5 MNDOT detail sheets included in the plans. <br />