My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/26/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 04/26/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:49:11 PM
Creation date
6/15/2016 3:07:06 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/26/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
683
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BKV <br />R 0 U <br />CHANGE ORDER <br />AIA DOCUMENT G701 <br />Architecture Interior Design Landscape Ariiitectiae Engineering <br />Phone: 61 2.339..3752 Fax• 6 i 2.339.62 12 www.bkvgroup.corn <br />Enriching Lives and Strengthening Cemrrikinitita <br />Owner: X <br />Architect: ?f <br />Consultant: <br />Contractor: X <br />Field: <br />Other: <br />THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH <br />RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA <br />DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. <br />PROJECT: CHANGE ORDER NO.: 01-LABOR <br />Ramsey Fire Station #2 <br />5650 Alpine Drive NW <br />Ramsey, MN 55303 DATE OF ISSUANCE: 11/345 <br />OWNER: <br />City of Ramsey ARCHITECT'S PROJECT #: 1937.01 <br />7550 5unwood Drive <br />Ramsey, MN 55303 <br />CONTRACT DATE: April 15, 2015 <br />ARCHITECT: <br />Boarman Kroos Vogel Group <br />222 N. 2"° Street CONTRACT FOR General Construction <br />Minneapolis, MN 55401 <br />TO CONTRACTOR: <br />Brennan Construction of MN <br />124 East Walnut Steet, Suite 20 <br />Mankato, MN 56001 <br />The contract is changed as follows: <br />(Include, where applicable, any undisputed amount attributable to previously executed Construction Change <br />Directives) <br />1' I RFP # <br />—1 —4 <br />1CR1 <br />2 I PR <br />f 3 PR 2 <br />4 <br />5 <br />6 <br />7 <br />1-8 <br />9 <br />10 <br />Subject <br />Scrapped Steel at Vestibule (RFC 9) <br />Revised Toilet Accessories <br />Generator Pad <br />CR 2 Reworked Trolley Beam Mounting (RFI 8) <br />CR 4 L Angle at Roof Trusses <br />CR 6 Revise Columns at N Apparatus Bay PR 5 Eliminate Trash Enclosure <br />CR 9 Electrical Permit Cost -- Subs paid for i ar nit <br />CRIO Plank connection at beams (RFI 34) <br />CR13 Sprinkler Permit cost —subs paid for permit <br />Credit <br />ADD <br />ADD <br />ADD <br />Credit <br />ADD <br />ADD <br />ADD <br />Labor <br />$2,479 <br />$ 5,881 <br />$711 <br />($ 800) <br />$2,132 <br />TOTALS: ADD $10,403 <br />ADD (0) Days <br />BFCV Group, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.