Laserfiche WebLink
The original Contract Sum was $ 1,450,000 <br />Net change by previously authorized Change Orders $ 0.00 <br />The Contract Surn prior to this Change Order was $ 1,450,000 <br />The Contract Surn will be (increased)(4c17o cril}�ged3 by this change order in the $ 10,403 <br />amount of <br />The new Contract Sum including this Change Order will be $ 1,460,403 <br />The Contract time will be (incrc sci)( se4)(unchanged) by (0) days. <br />The date of Substantial Completion as of the date of this Change Order therefore is: March 15, 2016 <br />NOTE: This summary does not reflect changes in the Contract Suf-i, Contract Time or Guaranteed Maximum Price <br />which have been authorized by Construction Change Directive until the cost and time have been agreed upon by <br />both the Owner and Contractor, In which case a Change Order is executed to supersede the Construction Change <br />Directive. <br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER: <br />ARCHITECT CONTRACTOR OWNER <br />Boarman Kroos Vogel Group, Inc. Brennan Construction of MN City of Ramsey <br />Address Address Address <br />222 N. 2nd Street_ 124 East Walnut Street, Suite 20 7550 Sunwood Drive <br />Minneapolis, MN 55401 Mankato, MN 56001 Ramsey, MN 55303 <br />BY BY BY <br />Bruce Schwartzman <br />Mark Landg; of f <br />DATE DATE f 0 Yl <br />Dean Kapler <br />DATE <br />1h is4) t S <br />AIA DOCUMENT G701 * CHANGE ORDER * 2001 EDITION * AIA- COPYRIGHT 2001. <br />THE AMERICAN INSTITUTE OF ARCHITECT'S, 1735 NEW YORK AVE., N.W., WASI-tINGTON, D.C. 20006-5292 <br />WARNING; Unlicensed photocopying violates U.S. copyright law and is subject to legal prosecution. This document was <br />electronically produced with permission of the AIA and cannot be reproduced without violation until the date of <br />expiration noted below. <br />BKV Group, Inc. <br />