Laserfiche WebLink
B K V <br />GROUP <br />CHANGE ORDER <br />AiA DOCUMENT G701 <br />ArtiteCtore Interior Design Lavir.iscape Arcnitetture Engineering <br />Phone: 612.339,3752 Fax: 612..339..6212 ww.w.bkvgroup cam <br />Enriching Lives and Strengliientng Communities <br />Owner: X <br />Architect: X <br />Consultant: <br />Contractor X <br />Field: <br />Other: <br />THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH <br />RESPECT TO ITS COMPLETION OR MODIFICATION, AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA <br />DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. <br />PROJECT: <br />Ramsey Fire Station #2 <br />5650 Alpine Drive NW <br />Ramsey, MN 55303 <br />OWNER: <br />City of Ramsey <br />7550 Sunwood Drive <br />Ramsey, MN 55303 <br />ARCHITECT: <br />Boorman kroos Vogel Group <br />222 N. 2" Street <br />Minneapolis, MN 55401 <br />TO CONTRACTOR: <br />Brennan Construction of MN <br />124 East Walnut Street, Suite 20 <br />Mankato, MN 56001 <br />CHANGE ORDER NO.: 01-Material <br />DATE OF ISSUANCE: 1113/15 <br />ARCHITECT'S PROJECT #: 1937,01 <br />CONTRACT DATE: March 15, 2015 <br />CONTRACT FOR: General Construction <br />The contract is changed as follows: <br />(Include, where applicable, any undisputed amount attributable to previously executed Construction Change <br />Directives) <br />f RFP # Subject Material <br />1 1 CR 1 Scrapped Steel at Vestibule (RFI 9) $474 <br />2 PR 1 Revised Toilet Accessories Credit ($415) <br />3 PR 2 Generator Pad ADO 478 <br />4 CR 2 Reworked Trolley Beam Mounting {RFI 8) ADD $452 <br />5 1 CR 4 L Angle at Roof Trusses ADD $2,239 <br />6 CR 6 Revise Columns at N Apparatus Bari ADD <br />7 PR 5 Eliminate Trash Enclosure . Credit $300) <br />8 CR 9 Electrical Permit Cost - Subs paid For permit — I ADD $489 <br />9 CR 10 Plank Connection beams (RFR 34) ! ADD $136 <br />10 _ - CR13 Sprinkler Permit Cost- Subs paid for permit ADD $545 <br />TOTALS: ADD $4,098 <br />ADD (0) Days <br />BKV Group, Inc. <br />