Laserfiche WebLink
The original Contract Sum was <br />Net change by previously authorized Change Orders <br />The Contract Sum prior to this Change Order was <br />The Contract Sum will be (increased)(de ' mNsr,il) by this change order in the <br />amount of <br />The new Contract Sum including this Change Order will be <br />The Contract time will be seei)( )(unchanged) by (0) days. <br />The date of Substantial Completion as of the date of this Change Order therefore is: <br />1,685,000 <br />0.00 <br />1,685,000 <br />4,098 <br />1,689,098 <br />March 15, 2016 <br />NOTE: This summary does riot reflect changes in the Contract Sum, Contract Time or Guaranteed Maximum Price <br />which have been authorized by Construction Change Directive until the cost and time have been agreed upon by <br />both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change <br />Directive. <br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER: <br />ARCHITECT <br />Boarman Kroos Vogel Group, Inc. <br />Address <br />222 N. 2nd Street <br />Minneapolis, MN 55401 <br />BY <br />Bruce Schwartzman <br />DATE DATE l /4- 0"' <br />CONTRACTOR <br />Brennan Construction of MN <br />Address <br />124 East Walnut Street, Suite 20 <br />Mankato, MN 56001 <br />BY <br />fra-/ <br />Mark Landgraff <br />OWNER <br />City of Ramsey <br />Address <br />7550 Sunwood Drive <br />Ramsey, MN 55303 <br />BY <br />Dean Kapler <br />DATE <br />) 12-0 <br />AIR DOCUMENT G701 * CHANGE ORDER *2001 EDITION * AIA -COPYRIGHT 2001 * <br />THE AMVIERICAN INSTITUTE OF ARCHITECT'S, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006-5292 <br />WARNING; Unlicensed photocopying violates U.S. copyright law and is subject to legal prosecution. This document was <br />electronically produced with permission of the ILIA and cannot be reproduced without violation until the date of <br />expiration noted below. <br />BRA/ Group, Inc. <br />