My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/08/2004
Ramsey
>
Public
>
Agendas
>
Council
>
2004
>
Agenda - Council - 06/08/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 2:27:06 PM
Creation date
6/4/2004 2:54:38 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/08/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Final l'lat Review': Rivenwick. Village <br />JtlJ-ic 4, 2004 <br />Page 4 of 5 <br /> <br />· lnsulai ion between watcrmain and sanitary or storm sewer shall consist of 2- 2" layers <br /> of insulation with the j<>int>; staggered. <br /> <br />[Jpdatcd details i~avc been provicled to your engineer. Please arrange to have revised plans <br />sunni tted. <br /> <br />Drainage and Utility_ Easement:;: The drainage and utility easements provided on the plat <br />cover all of the utilities proposed b)r this project. <br /> <br />Trunk Sewer and Water Fees: ~i he development is subject to trunk sewer and water fees in the <br />amount of $269,220 (140 x $1,92',). The 2004 sewer rate is $596.00/unit and the water rate has <br />been c.stablishcd ~tt $1,327.00, Thi:; cash payment must be received by the City prior to release of <br />thc mylars [bt rcc:)rding. <br /> <br />P,'u'li l)edication: Park dcdicatitm requirements are to be satisfied by a cash payment in the <br />amount of $30~-'.,000 (140 x ~;2,200). The Development Agreement outlines the park <br />improvements that will bce required as part of this development and related reimbursement for <br />completed improx cments. This pa~. ment must be received by the City prior to release of the Final <br />Plat tbr recording. <br /> <br />Trail I)evelopment and Fees: ri he City's current trail development fee is $550.00 per lot, or <br />$77,000 dollars in this case. Paym,mt of this fee is required prior to recording the plat. <br /> <br />A trail will need ,~o constructed o~ the north and south side of Riverdale Drive. The trail along <br />the north side of Rivet'dale Drive extending to the intersection of Ramsey Blvd. and Highway <br />#10 will not be t.,'ail credit eligibl<v. The developer will receive trail credit along the north and <br />west side el!' R ivcrdale park I~)r lraii construction as outlined in the Development Agreement. <br /> <br />Stormwater Mam~gementr Fee: ~l i~c' City has enacted a $375 per unit storm water management <br />l'ec that must bc paid prior to the ('ity releasing the final plat for recording. The amount required <br />~br the proposc~d 140 townhouse development is $52,500 ($375 x 140). <br /> <br />Sidewalk: 'l'hc plat is providing ;0r ~he required 5-foot sidewalk along Jaspar Street, Hematite <br />Street, and l Bgth ,\venue. '['he required sidewalk in front of front of Condominium unit 1, Block <br />3 and extending tin'ough Oudot B ha~; been eliminated. The final construction plans need to be <br />revised to inclttde the required sidewalk. <br /> <br />Other Permits: 'l'he developer i:s rc:sponsible fbr obtaining any permits required from other <br />regulatory ag. critics. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.