My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/08/2004
Ramsey
>
Public
>
Agendas
>
Council
>
2004
>
Agenda - Council - 06/08/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 2:27:06 PM
Creation date
6/4/2004 2:54:38 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/08/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUN-05-20~4 08:55 TKDA 651 292 0083 P.O? <br /> <br />Mr. Brian Olson <br />City of Ramsey <br />Proposal for Engineering Services - CSAH 83 (Armstrong Boulevard) Reconstruction <br />June 3.2004 <br />Page 6 <br /> <br /> IV. OWNER'S RESPONSIBILITIES <br /> <br />The OWNER'S responsibilities shMt be as set forth in Article 8 of the General Provisions and as <br />further described or clarified herei~below: <br /> <br />Designate one individual ti> act as the OWNER'S representative with respect to the work <br />to be performed, and such ~erson shall have complete authority to transmit instructions, <br />receive in:~ormation, interpret ~md define policies, and make decisions with respect to <br />critical elements pertinent ~o the Project. <br /> <br />Provide 'F~LDA with acces,~ to the site as required to perform services listed in <br />SECTION II above~ <br /> <br />Provide reviews of materiais flirnished by TKDA in a reasonable and prompt manner so <br />that the P~oject schedule cvn be maintained. <br /> <br />Provide TKDA with electronic basemapping including inplace topographic features, <br />inplace groundliue DTM, i~place public utilities, and inplace right-of-way. <br /> <br />Provide rI'KDA with location and elevation information for stormwater ponds that will <br />accept the Project'.~: storm (irainage. <br /> <br />Provide TKDA with Prelin dnary Layout on which the proposed design will be based <br />(provided to TKDA o~ Ma/i0, 2004). <br /> <br /> V, PERIOD OF SERVICE <br /> <br />We would expect to start our servia:es approximately February 1, 2005, with an assumed Project <br />duration of 13 months. We will complete all SECTION II services by June 1, 2006. <br /> <br />COMPENSATION <br /> <br />Compensation to TKDA for servic~:s provided as described in SECTION II of this Proposal <br />shall be on an Hourly Rate basis as described in Article 3 of the attached General Provisions in <br />an amount not to ~':xceed $250,200. Our detailed Project Fee Estimate and current Hourly Rate <br />Schedule are attached. <br /> <br />The level of effort required to acco~.nphsh SECTION II services can be affected by factors <br />which are beyond our control. Therefore, if it appears at any time that charges for services <br />rendered under SECTION II will t, xceed the above, we agree that we will not perform services <br />or incur costs whi~:h will result m billings in excess of such amount until we have been advised <br />by you that additional funds are av~,.ilable and our work can proceed. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.