My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 06/01/2004
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2004
>
Agenda - Council Work Session - 06/01/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 2:26:57 PM
Creation date
6/7/2004 3:05:43 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
06/01/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Northstar Corridor Ramsey Station <br />Rail Station Feasib.~lity Study <br /> <br />of the Ramsey st~tion, lengthenin,.l running times over that segment from the non-stop 8 to 9 <br />minutes to 12 to ! 3 minutes with ti~e. one added stop. Scaling by distance,'Ramsey would be 5 <br />minutes from Anoka. An advantage of the spacing is that the short-turn morning and evening <br />peak trains shouM have enough tine to run to and from Ramsey; that concept is shown in <br />Tables 2.3 and 2.4. <br /> <br />Station Evaluation $core~;e~"d <br /> <br />As part of the initial screening pro,;es.~ to determine the appropriate location for stations along <br />the Northstar Corddor Rail Project, the NCDA went through an evaluation process, using certain <br />criteria to evaluate the appropriateness of a station at various locations. A Ramsey station at <br />several locations was evaluated in th~: initial "First Level Station Site Evaluation Matrix." The <br />station most closoly related 'to the current proposed station was at Ramsey Boulevard north of <br />the BNSF railroad. This same evaiuation process (or scorecard) was conducted for the Ramsey <br />station based on the new Town C~:nter proposal to evaluate how it compares to the criteria ori- <br />ginally used for station considerati:m 'Fable 2.5 presents the station site evaluation scorecard for <br />the proposed Rarnsey station on t ~e Northstar line. <br /> <br />Kimley-Horn and Asso,:iates, Inc. <br /> <br />March 2004 <br /> <br />-9- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.