My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/28/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 06/28/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:50:35 PM
Creation date
6/30/2016 8:32:53 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/28/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1098
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
versus granite rock chips was noticed. However, based on the higher bid prices received for trap rock in 2015, and <br />based on Staff's field observations, there does not appear to be a significant benefit to using trap rock so Staff did <br />not propose to use trap rock with the 2016 project. <br />During the bid process staff received comments from potential bidders that granite sealcoat rock is in short supply <br />so the City should consider allowing an alternate bid for trap rock. To ensure bids would be received for the project <br />Staff prepared an addendum requesting an alternate bid for trap rock in lieu of granite. Epoxy paint was also <br />specified for all striping in the addendum. <br />On June 21st three (3) sealed bids were received and publicly opened and read aloud. City staff checked each bid <br />for errors and omissions, then tabulated the bids. All bids were found to be competitive and favorable, complied <br />with the advertisement for bids, and required no adjustments based on staff review. A summary of the bids is <br />included below, as well as in the attached resolution. <br />CONTRACTOR <br />BASE BID (granite <br />rock) <br />ALTERNATE BID <br />(trap rock) <br />Pearson Bros., Inc. <br />Allied Blacktop Company <br />Asphalt Surface Technologies Corp. <br />Engineer 's Estimate <br />$260,521.76 <br />$268,472.05 <br />$289,480.05 <br />$345, 637.32 <br />$260,521.76 <br />$0 <br />$299,960.31 <br />$345, 637.32 <br />Of the three bids received, the lowest responsible bid was submitted by Pearson Bros., Inc. of Hanover, Minnesota, <br />in the amount of $260,521.76. This bid price is valid for either the base bid or the alternate bid. This bid is <br />$85,115.56 or 24.6% less than the engineer's estimate of $345,637.32. <br />When reviewing bids, Staff observed that quantities for four of the fifteen bid items in the bid proposal were <br />between 7% and 23% less than the quantities associated with the proposed design as shared with Council on May <br />24th. In addition, based on the lowest responsible bid over $150,000 would have remained unspent from the <br />$500,000 budgeted for sealcoats in 2016. Staff therefore used the bid proposal quantities to revise the proposed <br />project scope by removing 2.66 miles of street segments from the original project to allow the City to accept bids <br />and award a contract for construction to the lowest responsible bidder as shown on the attached plan sheet. Staff <br />then proposes to bid a second sealcoat project in 2016 to use the remainder of the $500,000 budgeted annually for <br />sealcoats. This will be discussed in detail in a subsequent City Council case this evening. <br />Following award of contract, staff will immediately issue a Notice of Award to Pearson Bros., Inc. to initiate <br />execution of a contract and issuance of required bonds and insurance. The City Attorney will then verify the <br />contract, bonds and insurance are in proper legal form prior to execution of the contract. Once the contract is <br />executed, staff will issue a Notice to Proceed allowing construction to begin. At this time it is anticipated <br />construction will begin after July 4h and will be completed by August 19th. <br />Notification: <br />No notifications were required for this case. Advertisements for bids were published in the Anoka Union Herald <br />and in Finance and Commerce on May 27th and June 3rd. <br />Observations/Alternatives: <br />Observations: <br />Streets proposed to receive crackseal and sealcoat improvements under Division A of the 2016 Street Maintenance <br />Program were selected by City staff based on various criteria including Pavement and Surface Evaluation Rating <br />(PASER), maintenance histories, available budget, location, and other less tangible criteria. <br />Specifications are not attached but will be available for review at the Council meeting, if needed. <br />Alternatives: <br />
The URL can be used to link to this page
Your browser does not support the video tag.