Laserfiche WebLink
Permitting · Most developments require permits. Including municipal projects. <br /> · 38 permits in 2002, 31 pe~Tnits in 2003 <br /> · Water Quality (usually achieved through ponding) <br /> · Sedimentatio~erosion control during construction (silt fencing, hay bales) <br /> · Flooding (sets mi~dmum building elevations above 100 year event) <br /> · Flooding ( limits runoff rate to predevelopment rates or less) <br /> <br />Wetland Protection: · WMO is LGU for WCA in Anoka, Andover and Ramsey <br /> · Verify wetland delineation <br /> · Approve wetland filling exemptions <br /> · Approve sequencing (fill with mitigation) <br /> <br />Studies <br /> · <br /> · <br /> · <br /> · <br /> · <br /> <br /> and Data Collection <br />Lake level monitoring Rogers, Round and Itasca lakes since 1989 <br />Lake water quality on Rogers and Round lakes <br />Stream level monitoring on Ford and Trott Brooks <br />Stream chemical and biological monitoring on Ford and Trott Brooks <br />Special stream surveys on CD 3/66 and CD 3 in Anoka <br /> <br /> <br />