Laserfiche WebLink
4.7 Right-of-Ways/Easements <br />It is anticipated that all improvements will occur within existing City right-of-ways and/or <br />easements. It is therefore not anticipated that the City will need to acquire any right-of-way or <br />easements for this project so right-of-way and/or easement acquisition costs are not included in <br />the probable project costs. This will need to be verified as part of the final design process. <br />If right of entry is required from an individual property owner for grading or utilities work, or for <br />driveway, landscaping, or irrigation system restoration activities, it will be obtained prior to any <br />construction commencing. <br />Feasibility Report <br />Gibbon Street and 173rd Avenue Drainage Improvements <br />City of Ramsey Project No. 16-88 <br />Page 7 <br />