Laserfiche WebLink
ALTERNATE 2 <br /> <br />RIVER'S BEND PARK <br />1988 LAWCON IMPROVEMENTS <br /> <br />Work <br /> <br />1. Ag Lime 1 Baseball Field <br /> <br />2. Develop Soccer Field <br /> <br />3. Construct 3 Tennis Courts <br /> <br />4. Expand Parking Lot & Extend <br /> Access Road <br /> 24x390 & 70x80 = 350T/$7.00 <br /> Grading 1,6625Y @ $2.00/SY <br /> <br />5. Landscaping <br /> <br />6. Site Improvements <br /> Embankment 2,000CY @ $5/CY <br /> Restrooms 400SF @ $45/SF <br /> Sewer & water 370LF @ $10/LF <br /> Turf est. 3A@ $1,000/A <br /> <br />Cost <br />$3,100 <br /> <br /> 3,000 <br />51,000 <br /> <br /> 5,800 <br /> <br /> 2,000 <br />38,400 <br /> <br />Breakdown <br /> <br />$2,500 <br /> 3,300 <br /> <br />10,000 <br />18,000 <br /> 7,400 <br /> 3,000 <br /> <br />Eligible <br /> <br /> $3,100 <br /> <br /> 3,100 <br /> 51,000 <br /> <br /> 5,800 <br /> <br />Construction <br />Contingency @ 10% <br />Design & Engineering @ 15% <br /> <br />$103,300 <br /> 10,300 <br /> 15~500 <br /> <br />$ 77,900 <br /> 7,800 <br /> 7~800 <br /> <br />TOTAL PROJECT <br />LAWCON SHARE <br />CITY SHARE <br /> <br />$129,100 <br /> 40~000 <br />$ 89,100 <br /> <br />$ 93,500 <br /> 40~000 <br />$ 53,500 <br /> <br />*NOTE: <br /> <br />Assumes topo will provide minimum 2' cover over sewer, <br />otherwise may require lift pump ($8,000~). <br /> <br /> <br />