My WebLink
|
Help
|
About
|
Sign Out
Home
04/23/87 Special
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1980's
>
1987
>
04/23/87 Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 8:46:43 AM
Creation date
6/14/2004 10:54:19 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning and Zoning Commission - Special
Document Date
04/23/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
375:117, Subd. <br /> (Rev. !g83) <br /> <br />property shall Itkewtse not be considered <br />again by the Planntng Conetssion or Ctty <br /> <br />Counctl for an additional stx ($) months fra: <br />the date of the second dental unless a <br />decision to reconsider such matter is made by <br />not less than fouroftfths (4/S) of the full <br />Ctty Counct1. <br /> <br />(v) <br /> <br />Approval of a request shall requtre passage by <br />a ma.lortty vote of the Ctty Counct1. The <br />Oirector of Planntng shall nottfy the <br />applicant of the Council's dectston in <br />wrtttng. <br /> <br />(d) Final Site Plan. <br /> <br />(z) <br /> <br />Purpose. The Ftnal Stte Plan ts to serve as a complete, <br />thorough, and permanent publlc record of the manner <br />which the sub~ect site ts to be developed. It shall <br />Incorporate all prtor approved plan revisions resulting <br />from the Stte Plan Revtew process. <br /> <br />Schedule. Upon receiving all required ftnal approvals <br />through the Site Plan Revtew process, the developer shall <br />prepare a Final Site Plan reflecting all revisions and <br />conditions of approval. Three (3) copies of this Final <br />Site Plan shall be submitted to the Otrector of Planntng <br />for review and approval. , <br /> <br />(A) <br /> <br />After a Final Site Plan has been submitted and <br />approved and before any gtte preparation work or site <br />improvements take place, a preconstruction meeting <br />shall be required to take place. It shall be the <br />developer's responsibility to arrange the <br />preconstructton meeting with the City Staff. <br /> <br />(e) <br /> <br />At a mtntmum, tn addttton to the Ctty Staff, the <br />meettng shall be attended by the developer, <br />architect/engineer, and general contractor of the <br />pro~ect. <br /> <br />(3) <br /> <br />Limitation on Ftnal Stte Pl anApproval, gtthtn one (1) <br />year after the Ctty Counct1 approval of a Ftnal Site Plan, <br />or such shorter ttme as maybe established by the approved <br />development schedule, construction shall commence with the <br />approved plan. <br /> <br />4! <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.