My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 06/15/2004
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2000 - 2009
>
2004
>
Agenda - Public Works Committee - 06/15/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 2:20:32 PM
Creation date
6/16/2004 9:08:13 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
06/15/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P.E. '- 2'- January 7, i999 <br /> <br />1 <br /> <br />However; Mn/2DOT ac~.ow[edged that wawants could yet be met at [42nd Avenue even a.~er <br />the roadway and si~al~=_. . are [nstalIed ar CSAZ-I 5 and XkLmo. However, they would like to be <br />able to wait and actually make :'. affF. c counts at that fix-ne that would document signal warrants <br />beLag met. The warrants that ~ey have stated that they would accept are warrants !, 2 a.nd 8 of <br />the Manual on Uniform r_r~-f.c Control Devices. <br /> <br />Tais intersection is ob¼ously in a ~ay area. with regard ro requ/fmg rraL-5c signal control based <br />on the most recent ~a,.~f.c counu. However, Ce project is nor scheduled for bidding until <br />October of 1999, widx completion in late year 2000. As a result, there will be opportunities to <br />review the ~a..~c volumes ar later dares. During nit t/me between now and tko comple~on of the <br />project, addi~onal development-generated tra..¢5c or additional tra_f--~c growth may occur to the <br />point [lhat watt.ts are satisfied. <br /> <br />Tee fund,.'ng of the proposed signal at 142ndAvenue and the cost of [ts design will be <br />I00 pete. tnt tko respor, sibiliq; of the C~C¢ of Ramse7. Since there w;j! be no direct DL-JDOT cog <br />~artic{pation ~ the 142nd Avenue sign~, ~ey do not oppose ~e ~t~!adon of ~e condor <br />system d,~mg ~e roadway cons~acfion project, nor do ~ey oppose ~e prep~o: of sf~ <br />co~ac~on plus at ~s ~e. <br /> <br />The r%Ilowf_v.g co ,~se of action wa outlined as a result of dis discussion: <br /> <br /> conduit, system for a "~ture" signal at I42ndAvenue wilt be designed, bid and <br />consmacted with the roadway improvement project. Interconnect cable from <br />CS.&r-I l i6 to CS,~2-t 5 will be .run rkrough these conduits as well. <br /> <br />The rem ,ai_nder of the signal system; poles, w/ring, etc. will be designed a.nd included in <br />tko plans as a separate pay item wi~ con~atct stip~atioms of the possible deletion of that <br />pay item. at a D. rer dare, however a bid price will be taken. <br /> <br />The installation of the completed signal system will be control_ted in the contract time <br />provisions by the use of a delayed start date for that work. Tko start date wii1 be <br />renr-atiYely set for one month after ~e [ntersectiort of CS 'g2-t 5/X!dmo has been under ~ <br />siam'm2 control and a trna-ftc count can be made to determ/ne sic. al warrant status at <br />14-2nd Avenue. <br /> <br />The plans are to be completed i.n April of I999, with the bid [e,~ing in October I999. <br /> <br />A new ~ra~c count and wa. rr~t evaluation will be made in September of 1999. If the <br />si~ai is clearly justified at that t/me, tken t_he full signal system will be authorized for <br />construction ,~.ti.: the femaLe, der o[the project. <br /> <br />ff tko sign~ is not justirqed ~_ September of 1999, the project will be bid and consmlcted <br />initially with only the conduit system. After the completion of the CSAH 5/X2dmo signal <br />system in the sum_met of 2000, another signal warrant analysis will be performed. <br /> <br />~8 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.