14. Contract Times—The number of days or 23. Hazardous Waste—The term Hazardous <br /> the dates stated in the Agreement to: (i) Waste shall have the meaning provided <br /> achieve Milestones, if any, (ii)achieve in Section 1004 of the Solid Waste <br /> Substantial Completion; and (iii) Disposal Act (42 USC Section 6903) as <br /> complete the Work so that it is ready for amended from time to time. <br /> final payment as evidenced by Engineer's <br /> written recommendation of final 24. Laws and Regulations; Laws or <br /> payment. Regulations — Any and all applicable <br /> laws, rules, regulations, ordinances, <br /> 15. Contractor — The individual or entity codes, and orders of any and all <br /> with whom Owner has entered into the governmental bodies, agencies, <br /> Agreement. authorities, and courts having <br /> jurisdiction. <br /> 16. Cost of the Work — See Paragraph <br /> I LOLA for definition. 25. Liens — Charges, security interests, or <br /> encumbrances upon Project funds, real <br /> 17. Drawings — That part of the Contract property,or personal property. <br /> Documents prepared or approved by <br /> Engineer which graphically shows the 26. Milestone — A principal event specified <br /> scope, extent, and character of the Work in the Contract Documents relating to an <br /> to be performed by Contractor. Shop intermediate completion date or time <br /> Drawings and other Contractor submittals prior to Substantial Completion of all the <br /> are not Drawings as so defined. Work. <br /> 18. Effective Date of the Agreement — The 27. Notice of Award—The written notice by <br /> date indicated in the Agreement on which Owner to the Successful Bidder stating <br /> it becomes effective, but if no such date that upon timely compliance by the <br /> is indicated, it means the date on which Successful Bidder with the conditions <br /> the Agreement is signed and delivered by precedent listed therein, Owner will sign <br /> the last of the two parties to sign and and deliver the Agreement. <br /> deliver. <br /> 28. Notice to Proceed — A written notice <br /> 19. Engineer — The individual or entity given by Owner to Contractor fixing the <br /> named as such in the Agreement. date on which the Contract Times will <br /> commence to run and on which <br /> 20. Field Order—A written order issued by Contractor shall start to perform the <br /> Engineer which requires minor changes Work under the Contract Documents. <br /> in the Work but which does not involve a <br /> change in the Contract Price or the 29. Owner — The individual or entity with <br /> Contract Times. whom Contractor has entered into the <br /> Agreement and for whom the Work is to <br /> 21. General Requirements — Sections of be performed. <br /> Division 1 of the Specifications. The <br /> General Requirements pertain to all 30. PCBs—Polychlorinated biphenyls. <br /> sections of the Specifications. <br /> 31. Petroleum — Petroleum, including crude <br /> 22. Hazardous Environmental Condition — oil or any fraction thereof which is liquid <br /> The presence at the Site of Asbestos, at standard conditions of temperature and <br /> PCBs, Petroleum, Hazardous Waste, or pressure(60 degrees Fahrenheit and 14.7 <br /> Radioactive Material in such quantities or pounds per square inch absolute),such as <br /> circumstances that may present a oil, petroleum, fuel oil, oil sludge, oil <br /> substantial danger to persons or property refuse, gasoline,kerosene, and oil mixed <br /> exposed thereto in connection with the with other non-Hazardous Waste and <br /> Work. crude oils. <br /> Standard General Conditions <br /> 00 72 00-2 <br />