Laserfiche WebLink
32. Progress Schedule — A schedule, 41. Shop Drawings — All drawings, <br /> prepared and maintained by Contractor, diagrams, illustrations, schedules, and <br /> describing the sequence and duration of other data or information which are <br /> the activities comprising the Contractor's specifically prepared or assembled by or <br /> plan to accomplish the Work within the for Contractor and submitted by <br /> Contract Times. Contractor to illustrate some portion of <br /> the Work. <br /> 33. Project—The total construction of which <br /> the Work to be performed under the 42. Site — Lands or areas indicated in the <br /> Contract Documents may be the whole, Contract Documents as being furnished <br /> or a part. by Owner upon which the Work is to be <br /> performed, including rights-of-way and <br /> 34. Project Manual — The bound easements for access thereto, and such <br /> documentary information prepared for other lands furnished by Owner which <br /> bidding and constructing the Work. A are designated for the use of Contractor. <br /> listing of the contents of the Project <br /> Manual, which may be bound in one or 43. Specifications—That part of the Contract <br /> more volumes,is contained in the table(s) Documents consisting of written <br /> of contents. requirements for materials, equipment, <br /> systems, standards and workmanship as <br /> 35. Radioactive Material — Source, special applied to the Work, and certain <br /> nuclear,or byproduct material as defined administrative requirements and <br /> by the Atomic Energy Act of 1954 (42 procedural matters applicable thereto. <br /> USC Section 2011 et seq.) as amended <br /> from time to time. 44. Subcontractor — An individual or entity <br /> having a direct contract with Contractor <br /> 36. Related Entity — An officer, director, or with any other Subcontractor for the <br /> partner, employee, agent, consultant, or performance of a part of the Work at the <br /> subcontractor. Site. <br /> 37. Resident Project Representative — The 45. Substantial Completion — The time at <br /> authorized representative of Engineer which the Work (or a specified part <br /> who may be assigned to the Site or any thereof) has progressed to the point <br /> part thereof. where, in the opinion of Engineer, the <br /> Work (or a specified part thereof) is <br /> 38. Samples — Physical examples of sufficiently complete, in accordance with <br /> materials, equipment, or workmanship the Contract Documents, so that the <br /> that are representative of some portion of Work(or a specified part thereof)can be <br /> the Work and which establish the utilized for the purposes for which it is <br /> standards by which such portion of the intended. The terms "substantially <br /> Work will be judged. complete" and"substantially completed" <br /> as applied to all or part of the Work refer <br /> 39. Schedule of Submittals — A schedule, to Substantial Completion thereof. <br /> prepared and maintained by Contractor, <br /> of required submittals and the time 46. Successful Bidder — The Bidder <br /> requirements to support scheduled submitting a responsive Bid to whom <br /> performance of related construction Owner makes an award. <br /> activities. <br /> 47. Supplementary Conditions—That part of <br /> 40. Schedule of Values — A schedule, the Contract Documents which amends <br /> prepared and maintained by Contractor, or supplements these General Conditions. <br /> allocating portions of the Contract Price <br /> to various portions of the Work and used 48. Supplier — A manufacturer, fabricator, <br /> as the basis for reviewing Contractor's supplier, distributor, materialman, or <br /> Applications for Payment. vendor having a direct contract with <br /> Standard General Conditions <br /> 00 72 00-3 <br />