Contractor or with any Subcontractor to 1.02 Terminology
<br /> furnish materials or equipment to be
<br /> incorporated in the Work by Contractor A. The following words or terms are not defined
<br /> or any Subcontractor. but, when used in the Bidding Requirements
<br /> or Contract Documents, have the following
<br /> 49. Underground Facilities — All meaning.
<br /> underground pipelines, conduits, ducts,
<br /> cables, wires, manholes, vaults, tanks, B. Intent of Certain Terms or Adjectives
<br /> tunnels, or other such facilities or
<br /> attachments, and any encasements 1. The Contract Documents include the
<br /> containing such facilities,including those terms "as allowed," "as approved," "as
<br /> that convey electricity, gases, steam, ordered", "as directed" or terms of like
<br /> liquid petroleum products, telephone or effect or import to authorize an exercise
<br /> other communications, cable television, of professional judgment by Engineer. In
<br /> water, wastewater, storm water, other addition, the adjectives "reasonable,"
<br /> liquids or chemicals, or traffic or other "suitable," "acceptable," "proper,"
<br /> control systems. "satisfactory,"or adjectives of like effect
<br /> or import are used to describe an action
<br /> 50. Unit Price Work— Work to be paid for or determination of Engineer as to the
<br /> on the basis of unit prices. Work. It is intended that such exercise of
<br /> professional judgment, action or
<br /> 51. Work — The entire construction or the determination will be solely to evaluate,
<br /> various separately identifiable parts in general,the Work for compliance with
<br /> thereof required to be provided under the the requirements of and information in
<br /> Contract Documents. Work includes and the Contract Documents and
<br /> is the result of performing or providing conformance with the design concept of
<br /> all labor, services, and documentation the completed Project as a functioning
<br /> necessary to produce such construction, whole as shown or indicated in the
<br /> and furnishing, installing, and Contract Documents (unless there is a
<br /> incorporating all materials and equipment specific statement indicating otherwise).
<br /> into such construction, all as required by The use of any such term or adjective is
<br /> the Contract Documents. not intended to and shall not be effective
<br /> to assign to Engineer any duty or
<br /> 52. Work Change Directive — A written authority to supervise or direct the
<br /> statement to Contractor issued on or after performance of the Work or any duty or
<br /> the Effective Date of the Agreement and authority to undertake responsibility
<br /> signed by Owner and recommended by contrary to the provisions of Paragraph
<br /> Engineer ordering an addition, deletion, 9.09 or any other provision of the
<br /> or revision in the Work,or responding to Contract Documents.
<br /> differing or unforeseen subsurface or
<br /> physical conditions under which the C. Day
<br /> Work is to be performed or to
<br /> emergencies. A Work Change Directive 1. The word"day'means a calendar day of
<br /> will not change the Contract Price or the 24 hours measured from midnight to the
<br /> Contract Times but is evidence that the next midnight.
<br /> parties expect that the change ordered or
<br /> documented by a Work Change Directive D. Defective
<br /> will be incorporated in a subsequently
<br /> issued Change Order following 1. The word "defective," when modifying
<br /> negotiations by the parties as to its effect, the word"Work," refers to Work that is
<br /> if any, on the Contract Price or Contract unsatisfactory, faulty, or deficient in that
<br /> Times. it:
<br /> a. does not conform to the Contract
<br /> Documents,or
<br /> Standard General Conditions
<br /> 00 72 004