My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/23/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 08/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:52:06 PM
Creation date
8/22/2016 11:21:21 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/23/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.05 Before Starting Construction made to Contractor until acceptable schedules <br /> are submitted to Engineer. <br /> A. Preliminary Schedules: Within 10 days after <br /> the Effective Date of the Agreement (unless 1. The Progress Schedule will be acceptable <br /> otherwise specified in the General to Engineer if it provides an orderly <br /> Requirements), Contractor shall submit to progression of the Work to completion <br /> Engineer for timely review: within the Contract Times. Such <br /> acceptance will not impose on Engineer <br /> 1. a preliminary Progress Schedule; responsibility for the Progress Schedule, <br /> indicating the times (numbers of days or for sequencing, scheduling, or progress <br /> dates) for starting and completing the of the Work nor interfere with or relieve <br /> various stages of the Work,including any Contractor from Contractor's Rill <br /> Milestones specified in the Contract responsibility therefor. <br /> Documents; <br /> 2. Contractor's Schedule of Submittals will <br /> 2. a preliminary Schedule of Submittals; be acceptable to Engineer if it provides a <br /> and workable arrangement for reviewing and <br /> processing the required submittals. <br /> 3. a preliminary Schedule of Values for all <br /> of the Work which includes quantities 3. Contractor's Schedule of Values will be <br /> and prices of items which when added acceptable to Engineer as to form and <br /> together equal the Contract Price and substance if it provides a reasonable <br /> subdivides the Work into component allocation of the Contract Price to <br /> parts in sufficient detail to serve as the component parts of the Work. <br /> basis for progress payments during <br /> performance of the Work. Such prices ARTICLE 3—CONTRACT DOCUMENTS: INTENT, <br /> will include an appropriate amount of AMENDING,REUSE <br /> overhead and profit applicable to each <br /> item of Work. 3.01 Intent <br /> 2.06 Preconstruction Conference A. The Contract Documents are complementary; <br /> what is required by one is as binding as if <br /> A. Before any Work at the Site is started, a required by all. <br /> conference attended by Owner, Contractor, <br /> Engineer, and others as appropriate will be B. It is the intent of the Contract Documents to <br /> held to establish a working understanding describe a functionally complete Project (or <br /> among the parties as to the Work and to part thereof) to be constructed in accordance <br /> discuss the schedules referred to in Paragraph with the Contract Documents. Any labor, <br /> 2.05.A, procedures for handling Shop documentation, services, materials, or <br /> Drawings and other submittals, processing equipment that may reasonably be inferred <br /> Applications for Payment, and maintaining from the Contract Documents or from <br /> required records. prevailing custom or trade usage as being <br /> required to produce the intended result will be <br /> 2.07 Initial Acceptance of Schedules provided whether or not specifically called for <br /> at no additional cost to Owner. <br /> A. At least 10 days before submission of the first <br /> Application for Payment a conference C. Clarifications and interpretations of the <br /> attended by Contractor, Engineer, and others Contract Documents shall be issued by <br /> as appropriate will be held to review for Engineer as provided in Article 9. <br /> acceptability to Engineer as provided below <br /> the schedules submitted in accordance with 3.02 Reference Standards <br /> Paragraph 2.05.A. Contractor shall have an <br /> additional 10 days to make corrections and A. Standards, Specifications, Codes, Laws, and <br /> adjustments and to complete and resubmit the Regulations <br /> schedules. No progress payment shall be <br /> Standard General Conditions <br /> 00 72 00-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.